05/06/2026
PROJECT UPDATE 🏠🌴
Swipe to see the transformation ➡️
From site preparation and concrete columns to a nearly completed island home.
While the home is currently being built off-site by Plett’s Prefab Homes, it’s exciting to see how far this project has come. The structure, exterior finishes, flooring, drywall, and cabinetry are all coming together, and the home will soon be shipped to its final location for installation.
Building in Belize takes planning, coordination, and teamwork, and we’re proud to help guide the process from site preparation through delivery and installation.
🌴 Site Preparation by KC Project Management
🏠 Home being built off-site by Plett’s Prefab Homes
🔨 Columns, Pool & Utility Systems being built on-site by Secret Beach Homes
📋 Fully Coordinated by KC Project Management
We’re excited to share the next update when the home arrives on site and installation begins.