06/04/2026
If you operate a manufacturing or industrial facility in Ontario, the Global Adjustment (GA) isnโt just a line item on your utility billโitโs an ongoing obstacle to your operational margins.
But what if you stopped treating the GA as an unavoidable tax and started treating it as your single biggest opportunity to build a competitive advantage?
In Ontario, your GA billing methodology depends entirely on whether you are classified as Class A or Class B. To maximize your financial return, your energy strategy must match your billing class.
๐ Read our full structural breakdown of Class A vs. Class B solar engineering here: https://na3.hubs.ly/y0t-Jt0
Interested in seeing how much hidden value is sitting on your facility's roof? Message me directly or comment below to request a tailored solar feasibility study for your facility. ๐ค
Book your complimentary feasibility study today.
๐ https://na3.hubs.ly/y0t-P40
๐ฑ 1-833-474-0770
๐ฅ [email protected]