FFD POWER

Website Contact the business

FFD POWER Battery Design and Manufacture,ESS Solutions Integrator

A Second Order Says More Than the First 🔋A first BESS order is built on a proposal: the site requirements, the system de...
2026/11/02

A Second Order Says More Than the First 🔋

A first BESS order is built on a proposal: the site requirements, the system design and the commercial terms. A repeat order comes after the equipment has been installed and used. The customer has had time to gain real operating experience—and then decides to expand with the same supplier.
In Israel, we have seen this happen across three FFD POWER projects:
• One installation retained its original 1 × 215 kWh cabinetand added 4 × 261 kWh cabinets, reaching a total of 1.259 MWh across 5 cabinets.
• Another retained 10 × 215 kWh cabinetsand added 5 × 261 kWh cabinets, increasing total capacity to 3.455 MWh across 15 cabinets.
• A larger installation retained 22 × 233 kWh cabinetsand added 10 × 261 kWh cabinets, reaching 7.736 MWh across 32 cabinets.
These are three separate sites, not successive phases at one location. What connects them is the same pattern: customers added new cabinets to an existing installation rather than replacing the original system. The additional capacity came in a later project phase, after the first equipment had already been put into service.
That is what makes these orders meaningful to us. A first purchase may reflect a design proposal, a project schedule or a commercial decision. A later expansion is made with direct experience of the equipment and the supplier behind it.
We value that decision. It is a practical vote of confidence, not a slogan in a brochure. A second order is one of the most honest compliments a manufacturer can receive.

👉 Planning to expand an existing BESS? Contact FFD POWER to discuss the next phase of your project.

2026/10/30

When CAN Communication Fails and the Manual Offers No Answers, Check Your Grounding! 🔋

During the commissioning of our 500 kW / 2.61 MWh microgrid project in Ukraine—which integrates battery storage, 750 kW of PV, and an MPS equipped with STS switching and an isolation transformer—our technical team ran into a stubborn issue: unreliable CAN communication between the battery cabinets.

🔍 Tracing the Interference:
During initial installation, both the MPS and battery cabinets were connected to a single, shared grounding point. After methodical troubleshooting, our team traced the root cause of the signal noise directly back to this shared ground loop.

🛠️ On-Site Adjustment:
Our technical team guided the installation crew to separate the grounding points for the MPS and battery cabinets, ensuring they were repositioned more than 5 meters apart. Once separated, CAN communication stabilized immediately, allowing us to finish commissioning smoothly.

💡 Key Takeaway:
When CAN communication becomes unstable and standard user manuals don't yield answers, inspect the physical grounding layout between power conversion equipment and battery cabinets. Re-evaluating ground loops can save hours of troubleshooting during on-site commissioning.

👉 Planning a microgrid project with multiple battery cabinets? Reach out to FFD POWER for expert system integration and on-site commissioning support.

From Grid Supply to Islanded Operation | Inside Our Ukraine Microgrid ⚡In our first post, we introduced a 500 kW / 2.61 ...
2026/10/29

From Grid Supply to Islanded Operation | Inside Our Ukraine Microgrid ⚡

In our first post, we introduced a 500 kW / 2.61 MWh BESS integrated with 750 kW of PV in Ukraine.
The MPS microgrid cabinet combines a PCS, PV MPPT modules, a built-in STS and an isolation transformer.
DC Coupling for More Efficient Solar Charging
The PV array connects through MPPT DC/DC modules to the DC bus shared with the battery system. The PCS links this DC side to the site’s AC network.
For solar charging, this avoids converting PV power to AC through a separate PV inverter and then back to DC through a battery PCS. Fewer conversion stages reduce charging losses, improving the efficiency of storing solar energy for later use.
Coordinated PV Control Through the EMS
The integrated PV control gives the EMS a direct way to adjust solar output alongside battery charging and discharging, using load demand, battery state of charge and operating limits.
During islanded operation, the EMS coordinates three actions:
• Supply loads with available PV and direct surplus energy into the batteries.
• Limit PV output through the MPPT modules when load demand and available battery charging power cannot absorb all generation.
• Dispatch battery power to cover shortfalls as solar output falls.
PV curtailment and battery dispatch are coordinated within one system, helping maintain power balance during islanded operation.
Fast Transfer and Stable Islanded Operation
The built-in STS supports 20 ms transfer between grid-connected and islanded operation. Once islanded, the PCS establishes the local voltage and frequency reference to support the connected loads.
Electrical Isolation Within the MPS
The integrated transformer provides galvanic isolation in the power path. Combining these functions in the MPS simplifies on-site installation and interconnection.
Next, we’ll share practical grounding insights from our after-sales team to support reliable communication between battery cabinets.

👉 Designing a DC-coupled solar microgrid? Contact FFD POWER for system configuration and integration support.

2026/10/26

Backup Power for an Unreliable Grid | 500 kW / 2.61 MWh Microgrid in Ukraine ⚡🔋

FFD POWER supplied a 500 kW / 2.61 MWh energy storage solution for a microgrid in Ukraine, integrating with 750 kW of PV to support essential loads during grid disturbances and outages.
Project Background
The site needed a local power supply that could continue operating when utility power became unavailable. Combining battery storage with solar generation provides an energy reserve for outages and allows available PV to contribute to the local supply.
System Configuration
• BESS: 500 kW / 2.61 MWh
• PV integration: 750 kW
• MPS with an integrated isolation transformer
• Built-in STS supporting 20 ms transfer between grid-connected and islanded operation
How the System Supports the Site
During normal operation, solar generation can supply local loads and charge the batteries for later use.
When the grid becomes unavailable, the STS supports a fast transition to islanded operation. The MPS then manages the local supply, with battery storage and available PV supporting the backed-up loads.
This brings solar integration and outage support into one microgrid solution, reducing the site's dependence on utility availability.
In our next post, we’ll explain how the MPS, STS and isolation transformer work together—and why fast switching is only one part of reliable backup power.

👉 Planning a solar microgrid for an unreliable grid? Contact FFD POWER to discuss storage capacity, backup loads and system integration.

Keeping Solar Storage Operational During Maintenance: The Value of Modular BESS 🔋Our solar-plus-storage project in Israe...
2026/10/23

Keeping Solar Storage Operational During Maintenance: The Value of Modular BESS 🔋

Our solar-plus-storage project in Israel is designed to maximize the value of solar energy through nighttime electricity exports. But what happens when part of the system requires maintenance?
For this 700 kW / 3.654 MWh installation, the modular architecture addresses this operational challenge by allowing individual units to be serviced without necessarily shutting down the entire system.
The installation consists of 14 Galaxy261L battery cabinets, each connected to its own 50 kW hybrid inverter.
Instead of depending on a single centralized battery-inverter configuration, the system is divided into 14 individual units.
This creates an important maintenance advantage.
If one unit needs to be taken offline, it can be isolated without necessarily stopping the remaining 13 units.
The remaining system retains a nominal capacity of:
⚡ 650 kW inverter power
🔋 3.393 MWh battery storage
That represents approximately 92.9% of the original rated capacity, assuming all other units remain available.
For projects relying on evening electricity exports, the ability to service individual units without a complete system shutdown can make a meaningful difference.
Modularity is not only about future expansion. It is also about maintaining operational flexibility throughout the system's service life.

A Modular Approach to Solar Storage in Israel 🔋In our latest Israeli solar-plus-storage project, we installed 14 Galaxy2...
2026/10/21

A Modular Approach to Solar Storage in Israel 🔋

In our latest Israeli solar-plus-storage project, we installed 14 Galaxy261L battery cabinets, each paired with its own 50 kW hybrid inverter.
Why use 14 individual units instead of concentrating the same capacity into a larger centralized system?
The answer lies in flexibility and operational independence.
Each battery-inverter pair provides:
• 261 kWh of battery storage
• 50 kW of rated inverter power
• Approximately 5.22 hours of nominal storage duration
Together, the 14 units deliver 700 kW / 3.654 MWh.
This distributed architecture offers several practical advantages:
1. Flexible sizing: Capacity can be configured according to energy requirements and investment budgets.
2. Scalable expansion: Additional battery-inverter pairs can be incorporated as project requirements grow, subject to site electrical capacity and integration requirements.
3. Maintenance flexibility: Individual units can be isolated for maintenance while the remaining units continue operating.
For a solar export application, storage capacity and discharge duration are just as important as inverter power.
Here, 14 modular units provide the required energy capacity while maintaining flexibility at the individual unit level.

14 Modular BESS Units for Evening Solar Export in Israel ☀️🔋Another solar-plus-storage project in Israel, designed to sh...
2026/10/19

14 Modular BESS Units for Evening Solar Export in Israel ☀️🔋

Another solar-plus-storage project in Israel, designed to shift daytime solar generation into higher-value evening export hours.
FFD POWER has deployed 14 Galaxy261L battery cabinets, each paired with a 50 kW hybrid inverter.
Project Configuration:
🔋 Battery Storage: 14 × Galaxy261L (261 kWh each)
⚡ Hybrid Inverters: 14 × 50 kW
🔋 Total Capacity: 3.654 MWh
⚡ Total Power: 700 kW
🌙 Nominal Storage Duration: 5.22 hours
The operating strategy is straightforward: store solar energy during the day and export it when evening electricity prices are higher.
With 3.654 MWh of storage behind 700 kW of inverter capacity, the system is designed for extended evening discharge rather than a short burst of high power.
The distributed configuration also supports flexible capacity planning and future expansion, allowing the customer to scale investment according to project requirements.
Next, we'll take a closer look at why this project uses 14 individual battery-inverter pairs instead of a centralized storage configuration.

From Electricity Prices to Battery Dispatch | EMS–SCADA Integration in Moldova🔋📶 For FFD POWER's 750 kW / 1.566 MWh sola...
2026/10/16

From Electricity Prices to Battery Dispatch | EMS–SCADA Integration in Moldova🔋📶

For FFD POWER's 750 kW / 1.566 MWh solar-storage project in Moldova, the customer's SCADA provides the hourly dispatch instructions.
Adapting the BESS to this trading workflow required both access to operating data and communication for power commands.
How the dispatch works
1. The customer's SCADA retrieves electricity-price information.
2. SCADA sends charging or discharging power setpoints to FFD POWER's EMS every hour, according to the customer's trading strategy.
3. Our EMS executes the received power instructions, subject to the battery system's operating limits.
This gives the customer control over when stored solar energy is released for sale, with the BESS following the hourly power schedule.
Connecting data and control
The integration covers both data access and control ex*****on:
The customer's SCADA can read operating data from FFD POWER's control platform, while the EMS receives power instructions from the SCADA and executes the corresponding control logic.
With operating data available to SCADA and power commands reaching the EMS, the battery system can participate in the customer's own energy trading workflow.
The integration supports the project's purpose: storing daytime solar and releasing it during higher-price periods under the customer's dispatch strategy.

👉 Need a BESS to work with your SCADA or energy trading platform? Contact FFD POWER to discuss EMS integration and data interfaces.

Proven and Reliable AC Coupling for Solar + Storage 🔋☀️ In our previous post, we introduced FFD POWER's 750 kW / 1.566 M...
2026/10/14

Proven and Reliable AC Coupling for Solar + Storage 🔋☀️

In our previous post, we introduced FFD POWER's 750 kW / 1.566 MWh BESS in Moldova. The project uses AC coupling to integrate six Galaxy 261 cabinets with the solar farm.
How the systems connect
The PV inverters and the BESS power conversion systems connect through the site's AC network:
• PV inverters convert solar DC power into AC power.
• Each cabinet's bidirectional PCS converts AC power for battery charging and battery DC power back to AC for discharge.
Connecting storage on the AC side allows the PV inverters and DC strings to retain their existing arrangement. PV output and battery charging or discharging are coordinated to follow the site's trading strategy while keeping grid export within the permitted limit.
Working within the export limit
The site's 700 kW PV inverter capacity exceeds its 498 kW export limit. The BESS absorbs surplus solar for later export.
When that stored energy is released, the combined export from PV and storage must remain within the same limit, requiring coordinated control of PV output and battery power at the grid connection.
In our final post, we'll explain how the customer's SCADA sends hourly power instructions to our EMS.

👉 Adding storage to a solar farm? Contact FFD POWER to discuss AC coupling and integration with your grid connection.

2026/03/07

Address

523000
Dongguan
Building 1 , Ping An Industrial Park , No. 3, Shuixiang Avenue, Machong Town, Dongguan City