Jiahong Creative ODM Factory

Jiahong Creative ODM Factory OEM/ODM product development from China. From idea to sample to production. Mainly produce customized pvc figures and small home appliance.

Your product team in China.

21/08/2026

We’ve added a new automatic glue dispensing machine to our assembly process.

Once the parts are positioned in the fixture, the dispensing head follows a programmed path to apply adhesive to the required areas.

For batch production, automation like this helps make the dispensing process more repeatable and reduces variation between parts.

20/08/2026

Here’s a wider look inside our PCBA workshop.

Instead of focusing on one production step, this video takes you through the workshop from the entrance — showing the production lines on both sides and the equipment supporting our electronics assembly work.

PCBA manufacturing involves many connected processes, and having the production lines and equipment working together helps keep the workflow organized and efficient.

Can multiple blind box designs share one toy safety test?Sometimes — but having 6, 8, or 12 figures in the same collecti...
14/08/2026

Can multiple blind box designs share one toy safety test?

Sometimes — but having 6, 8, or 12 figures in the same collection does not automatically mean one test report can cover them all.

If the designs use the same materials, paint system, similar structures, similar sizes, and the same age grading, representative or family testing may be possible. But a secret figure, detachable accessory, metallic paint, glow pigment, flocking, magnet, battery, or different structure may require additional review.

For blind box buyers, the key is to compare the safety risks of each design before testing — not simply count how many figures are in the series.

A design comparison table can help the manufacturer, buyer, importer, and testing laboratory decide which samples actually need to be tested.

Read the full guide:
https://jiahongcreative.com/blind-box-toy-safety-testing-share-one-test/

11/08/2026

This is one of the cable-fixing steps in our PCBA assembly process.

After the component is connected, insulation tape is applied to help secure the cable and protect the connection area before the unit moves to the next assembly stage.

Small preparation steps like this help keep the internal wiring organized and stable.

07/08/2026

This assembly step combines manual work with controlled equipment.

Adhesive is applied first, the components are then aligned and joined by hand, and the assembly is finally pressed by machine to help the parts sit together more evenly.

A consistent final result depends on every stage being completed correctly.

05/08/2026

This is a look inside our assembly production line.

The video begins with semi-finished products that have already completed part of the assembly process, then follows the line from the first station to the final working area.

Each station handles a different task, allowing the products to move through assembly in an organized and continuous flow.

Glow, flocking, metallic paint, or a secret figure?Blind box special editions can make a collection more exciting — but ...
01/08/2026

Glow, flocking, metallic paint, or a secret figure?

Blind box special editions can make a collection more exciting — but the effect should be planned long before mass production begins.

Each option creates different production questions:

• Will the glow effect remain consistent?
• Can flocking survive handling and packaging?
• Will metallic paint show scratches or color variation?
• Does the secret figure require a new mold, accessory, or packing ratio?

A successful special edition is not only visually different. It also needs controlled sampling, repeatable production, clear QC standards, and suitable packaging protection.

Read our full planning guide:
https://jiahongcreative.com/blind-box-special-editions/

31/07/2026

The pressing machine is only the final part of this PCBA assembly step.

Before pressing begins, the component must be positioned and connected accurately by hand. The machine then applies controlled pressure to secure the assembly in place.

Good pressing starts with correct alignment.

30/07/2026

This is one of the post-molding steps in our silicone workshop.

Although the silicone part has already been formed, the thin material remaining in the center still needs to be opened manually.

This hole-clearing step prepares the component for later installation, connection, or assembly.

28/07/2026

A finished product is only one step away from delivery.

This is our finished goods warehouse, where completed products are organized, stored, and prepared before shipment.

Reliable production also requires reliable inventory management and shipment preparation.

From our factory to customers around the world.

Address

Shenzhen
518000

Alerts

Be the first to know and let us send you an email when Jiahong Creative ODM Factory posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share