Mufattish Inspector

Mufattish Inspector Sharing advise about quality control and pre-shipment inspection & services.

14/09/2021

inspection
activity such as measuring, examining, testing or gauging one or more characteristics of a product or service, and
comparing the results with specified requirements in order to establish whether conformity is achieved for each
characteristic

03/09/2021

Scoville.
وحدة قياس حرقة الفلفل

08/07/2021

اختبار الضغط على الانابيب. إيطاليا.

سكر مرفوض لعدم مطابقته للمواصفات
31/05/2021

سكر مرفوض لعدم مطابقته للمواصفات

يجب إزالة الثلج قبل فتح العنابر
31/05/2021

يجب إزالة الثلج قبل فتح العنابر

06/04/2021

There’s something seriously satisfying about watching work and workers in action. Here at Quantum Tech HD, we know how all these illustrious machines work, b...

no comment
05/04/2021

no comment

- Amazing Modern Excavator Bulldozer At New Level- Incredible Biggest Heavy Equipment Machines WorkingCre - Machines in this video:- Taylor MachineWeb: http:...

03/03/2021
16/02/2021

رحلة نعيش فيها معكم كواليس وجهود أبطال الجمارك في الموانئ من بداية وصول الحاوية إلى خروجها من الميناء.

15/02/2021

مصنع في ادمبرا بريطانيا ( نول كشمير).

13/02/2021

Six sigma
ماهو منهج ستة سيجما؟
هو منهج مركب لحل المشاكل ، بدأ في أمريكا سنة1987 مع شركة Motorola.
بمعنى آخر هو مقياس يستخدم لتحديد مدى جودة أو سؤ أداء عملية ما. 6 سيجما نسبة الجودة فيه 99،999998‰.
اي فرصة العيوب فى المليون عملية 3،4 عملية.

12/02/2021

Elements of inspection reports and inspection certificates:

1* Designation of the document, i.e. as an inspection report or an inspection certificate, as appropriate
2* Identification of the document, i.e. date of issue and unique identification
3* Identification of the issuing body
4* Identification of the client
5* Description of the inspection work ordered
6* Date(s) of inspection
7* Identification of the object(s) inspected and, where applicable, identification of the specific components that have been inspected and identification of locations
where e.g. NDT methods have been applied
8* Information on what has been omitted from the original scope of work
9* Identification or brief description of the inspection method(s) and procedure(s) used, mentioning the deviations from, additions to or exclusions from the
agreed methods and procedures
10 Identification of equipment used for measuring/testing.
11 Where applicable, and if not specified in the inspection method or procedure, reference to or description of the sampling method and information on
where, when, how and by whom the samples were taken
12* If any part of the inspection work has been subcontracted, the results of this work shall be clearly identified
13 Information on where the inspection was carried out
14 Information on environmental conditions during the inspection, if relevan
15* The results of the inspection including a declaration of conformity and any defects or other non-compliances found (results can be supported by tables, graphs, sketches and photographs)
16 A statement that the inspection results relate exclusively to the work ordered or the object(s) or the lot inspected
17 A statement that the inspection report shall not be reproduced except in full without the approval of the inspection body and the client
18 The inspector’s mark or seal
19* Names (or unique identification) of the staff members who have performed the inspection and in cases when secure electronic authentication is not undertaken, their signature, (see also clause 13.3 of ISO/IEC 17020)

Note: The elements of inspection reports/certificates that are considered to be mandatory for compliance with ISO/IEC 17020 are marked with an asterisk (*)

Address

London

Telephone

+447459340921

Website

Alerts

Be the first to know and let us send you an email when Mufattish Inspector posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share