Referb and alteration project.
The difference 3 days can make.
Properly soft stripped.
All services disconnected leaving only builders supply.
Upstairs bathroom/box room stripped back to brick work.
New larger floor joist installed beside existing to level floor and built in to the exterior wall as part of works to correct a 30mm bow in the wall. Then we will be carrying out helifix repairs and a reinforced render detail pre plaster.
Kitchen and w/c
Stripped back to brickwork, existing damp and rotten floor removed, floor level taken down ready for hardcore and concrete before an insulation and liquid screed detail.
Dining room, lounge and kitchen ceiling removed to carry out rewire and full replumb before 100mm insulation between joists.
Load bearing wall between kitchen and w/c removed with new beam in place ready to form an enlarged bathroom to rear.
Load bearing wall between dining room and kitchen removed with hd lintel in place to form kitchen dining area.
Blocked up fireplaces opened up.
Lean to roof to rear and leaning brick work gable has been stripped ready for a new roof with increased timber size to allow us an increased insulation detail with vaulted ceiling finish inside.
Now to leave the properly rest for a couple days before removing all acro props and starting on stage 2 of window/door alterations along with new stud works.
So far 20T of rubbish has come from this 3 bed property, but not all rubbish with finding some 1912 new paper between the door frames