Better Built Ltd

Better Built Ltd Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Better Built Ltd, Business service, Balbriggan Dublin, Dublin.

The Australian work horse 💪I wanted to get something a little different to a typical work van I’d have at home,Ended up ...
19/04/2026

The Australian work horse 💪
I wanted to get something a little different to a typical work van I’d have at home,
Ended up buying this Hilux that turned into a bigger project then anticipated,
Had to get it through the Aussie NCT,
Buy a big tool box for the back, roof racks,
Bit of mechanical work unfortunately and get a nice set of tyres for it,
Sure what else would you want to be driving over here !
HON HECTOR THE HILUX

Better built is relocating to Melbourne 🇦🇺🦘 Thank you all for keeping me so busy here and supporting my business but now...
16/06/2025

Better built is relocating to Melbourne 🇦🇺🦘
Thank you all for keeping me so busy here and supporting my business but now I’m really excited for this new chapter down under and to be working in a different country. Keep her lit…. mate!

Way to make an Entrance!Custom Porch made from Douglas Fir beams from  Finished with osmo oil to give it that glow,You c...
15/03/2025

Way to make an Entrance!

Custom Porch made from Douglas Fir beams from
Finished with osmo oil to give it that glow,
You can hardly see it but clear roof sheeting on top,
Soffit changed to suit and an extra light added 💡
Love the finish on this one ☘️

Basement Project Part 4-Concrete floor painted, walls painted,Bathroom refittedKitchen refitted Skirting to be fitted an...
26/10/2024

Basement Project Part 4-

Concrete floor painted, walls painted,
Bathroom refitted
Kitchen refitted
Skirting to be fitted and room done,
Henry the hoover working overtime !
The sump pit is well concealed at the back of the room with access from a manhole ⭕️

Basement project Part 3- Studwork and plasterboard,All studwork stick framed on-site, services hidden in behind and the ...
23/10/2024

Basement project Part 3- Studwork and plasterboard,
All studwork stick framed on-site, services hidden in behind and the walls are away from the membrane as to not disturb it,
No fixings put into the ground, finally seeing the room coming back together!
Wall built out at stairs to act as handrail, you can see how much that rail had to be scribed in the photograph.
Nearly there now !

Basement Project part 2-Now to put it all back together again!Since phase 1 was completed another company had installed ...
17/10/2024

Basement Project part 2-
Now to put it all back together again!
Since phase 1 was completed another company had installed the membrane on Both the floor and walls.
The floor screed had been put in and allowed time to dry.
In order to get a complete seal, the stairs had to be removed, the under stairs WC and kitchen area were taken out and brought off to storage.
The first job was to make a new stairs, as the floor level had increased the old stairs wouldn’t work,
So one was made up on site.
All of the walls will eventually have to be plasterboarded.
Before the stairs could be installed I had to batten out the wall that it would be going up against.
We were not able to pierce the membrane… so more challenges… but no bother to us!
So next up the whole room had to be built out with perimeter studs and plasterboarded.

Clip in ladder-Fun little project I wanted to do to help out the lads at  All fixings drilled and plugged               ...
11/09/2024

Clip in ladder-

Fun little project I wanted to do to help out the lads at
All fixings drilled and plugged

Under stairs bathroom studded, slabbed, door cut to suit and hung Making use of under the stairs, working alongside a pl...
27/08/2024

Under stairs bathroom studded, slabbed, door cut to suit and hung

Making use of under the stairs, working alongside a plumber we made a bathroom from a space that was empty under the stairs,
Unfortunately no before photos.

Decking stair replacement- Treated timber used, stainless screws, exterior wood glue and fiberglass strips placed under ...
20/08/2024

Decking stair replacement-

Treated timber used, stainless screws, exterior wood glue and fiberglass strips placed under the 9x2 where it meets the concrete to keep it off the wet.

Got a great bit of help with this from my cousin, also called Luke (great name).
Tricky one because both the decking and the path it was landing on were off level, the path was running off by about 50 mm, love a challenge !

Vinyl vibe TV unit-
26/06/2024

Vinyl vibe TV unit-

Address

Balbriggan Dublin
Dublin

Telephone

+353870909859

Website

Alerts

Be the first to know and let us send you an email when Better Built Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Featured

Share