π¨ Massive Project Completed! π¨
Hohenstein Lodge:
6 months. Remote location. Zero grid.
We powered an entire lodge completely off-grid with top-tier tech:
β‘ 166 kW solar
π 508 kWh battery storage
π 165 kVA backup generator
βοΈ Full electrical, refrigeration & air-con systems β done from the ground up.
Proud to say this is a Sigenergy off-grid system β high-end, reliable, and built to perform.
πͺ Huge congrats to my team β world-class work in record time!