JF Electrical Services

JF Electrical Services Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from JF Electrical Services, Business Supply Service, Magsaysay Ext. , Brgy. Bagacay, Calbayog City.

Services Offered: Solar installation, electrical design for buildings, auxiliary building design, plan signing and sealing, air conditioner installation and cleaning, building wiring, and electrical materials distribution.

This nearly complete 6kW hybrid solar power system features a 6kW hybrid inverter capable of managing both grid connecti...
22/05/2026

This nearly complete 6kW hybrid solar power system features a 6kW hybrid inverter capable of managing both grid connection and energy storage. It includes 8.12kW of photovoltaic panels composed of 14 German-manufactured 580W solar modules, designed for high efficiency and durability. The system is equipped with a 16kWh lithium iron phosphate battery, offering reliable energy storage with long cycle life and safety. Safety features encompass a fireman switch or Rapid Shutdown Device, AC and DC Surge Protection Devices, and a comprehensive grounding system to mitigate fire hazards and ensure operational safety.

100% completion of a 6kW Hybrid Solar Power System featuring 14 bifacial German-made solar panels, each rated at 580W, a...
20/05/2026

100% completion of a 6kW Hybrid Solar Power System featuring 14 bifacial German-made solar panels, each rated at 580W, along with one 16kWh lithium iron phosphate battery. The system includes safety features such as a fireman switch or Rapid Shutdown device, combined with Surge Protection Devices to ensure optimal safety and protection. Congratulations and thank you for trusting us!


πŸ‡©πŸ‡ͺ

Powering Development, Protecting the Environment.

Contact us @ 09177949327
Visit us at JF Electrical Services Office at Magsaysay Extension, Brgy. Bagacay, Calbayog City, Samar.

Hybrid Solar Power Installation!  Thank you for always trusting us!   πŸ‡©πŸ‡ͺ Powering Development, Protecting the Environmen...
20/05/2026

Hybrid Solar Power Installation! Thank you for always trusting us!


πŸ‡©πŸ‡ͺ

Powering Development, Protecting the Environment.

Contact us @ 09177949327
Visit us at JF Electrical Services Office at Magsaysay Extension, Brgy. Bagacay, Calbayog City, Samar.

19/05/2026

Ongoing Hybrid Solar Project.

Thank you for always trusting us!


πŸ‡©πŸ‡ͺ

Powering Development, Protecting the Environment.

Contact us @ 09177949327
Visit us at JF Electrical Services Office at Magsaysay Extension, Brgy. Bagacay, Calbayog City, Samar.

Ongoing 6kW Hybrid Solar Project in Caramel Subdivision.  Thank you for always trusting us!   πŸ‡©πŸ‡ͺ Powering Development, P...
18/05/2026

Ongoing 6kW Hybrid Solar Project in Caramel Subdivision. Thank you for always trusting us!


πŸ‡©πŸ‡ͺ

Powering Development, Protecting the Environment.

Contact us @ 09177949327
Visit us at JF Electrical Services Office at Magsaysay Extension, Brgy. Bagacay, Calbayog City, Samar.

Mas maupay gud yana mag pa siguro nala mag pa Solar para waray kabarak-an kun mag kulang an kuryente.
18/05/2026

Mas maupay gud yana mag pa siguro nala mag pa Solar para waray kabarak-an kun mag kulang an kuryente.

VISAYAS GRID ALERT STATUS
Update as of 18 May 2026, 8AM

Yellow Alert
4:00PM- 8:00PM

Available Capacity - 2,676MW
Peak Demand - 2,513MW

13 plants are on forced outage since May 2026, 1 plant since March 2026, 3 plants since 2025, 2 plants since 2024, 2 plants since 2023, and 1 plant since 2021, while 11 plants are running on derated capacities, for a total of 852.9MW unavailable to the grid.

Factors that contributed to the YELLOW Alert declaration:
1. Unavailability of Visayas' large coal plants TVI 1, TVI 2, and PEDC 3

2. High forecasted system demand

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.


17/05/2026

580 Watts made in Germany πŸ‡©πŸ‡ͺ bifacial Solar Panels with 15 years warranty!


πŸ‡©πŸ‡ͺ

Powering Development, Protecting the Environment.

Contact us @ 09177949327
Visit us at JF Electrical Services Office at Magsaysay Extension, Brgy. Bagacay, Calbayog City, Samar.

16/05/2026

Our second Hybrid Solar Project in Caramel Subdivision.

Hybrid Solar Project.
15/05/2026

Hybrid Solar Project.

Ongoing Electrical Project in Brgy. Bagacay.
15/05/2026

Ongoing Electrical Project in Brgy. Bagacay.

Ongoing 16kW Hybrid Solar Power installation.
14/05/2026

Ongoing 16kW Hybrid Solar Power installation.

Address

Magsaysay Ext. , Brgy. Bagacay
Calbayog City
6710

Website

Alerts

Be the first to know and let us send you an email when JF Electrical Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JF Electrical Services:

Share