From the first call to the last signature, this is the sequence:
1. Site walk. We look at what is there, not at what the drawing says is there.
2. Quotation. Line by line — every device, every metre of conduit, the labour, the testing. You see what you are paying for.
3. Scheduling with the building. Night windows, isolations, permits.
4. Installation. Roughing-in, devices, terminations, programming.
5. Testing and commissioning. Device by device, against a schedule.
6. Turnover. As-built drawings, test records, and the panel handed over in normal condition.
Step 6 is the one that gets skipped in this industry. It is the one you will need in a year.
Planning work in your building? Send us the site and the scope, and we will walk it with you.