๐จ FIDIC RED BOOK โ TOP CONTRACTOR CLAIMS YOU MUST KNOW ๐จ
Are you a Civil Engineer, Planning Engineer, QS, Contracts Engineer, or Project Manager?
Save this post for quick revision! ๐
โโโโโโโโโโโโโโ
๐น 1. Delayed Access to Site ๐ Clause 2.1 โ
Cost + EOT
๐น 2. Late Drawings / Instructions ๐ Clause 1.9 โ
Cost + EOT
๐น 3. Unforeseeable Physical Conditions ๐ Clause 4.12 โ
Cost + EOT
๐น 4. Suspension of Work ๐ Clauses 8.8โ8.9 (1999) ๐ Clauses 8.9โ8.10 (2017) โ
Cost + EOT
๐น 5. Employer-Caused Delay ๐ Clause 8.4 (1999) ๐ Clause 8.5 (2017) โ
EOT
๐น 6. Variations ๐ Clause 13 โ
Cost + Profit + EOT
๐น 7. Changes in Legislation ๐ Clause 13.7 (1999) ๐ Clause 13.6 (2017) โ
Cost + EOT
๐น 8. Force Majeure / Exceptional Events ๐ Clause 19 (1999) ๐ Clause 18 (2017) โ
EOT (+ Cost in some cases)
๐น 9. Employer's Failure to Pay ๐ Clause 16.1 โ
Financing Charges + EOT
๐น 10. Termination by Contractor ๐ Clauses 16.2โ16.4 โ
Cost + Profit + Compensation
โโโโโโโโโโโโโโ
๐ FIDIC CLAIM PROCEDURE
1๏ธโฃ Notice of Claim โ 28 Days
2๏ธโฃ Detailed Claim ๐ 42 Days (FIDIC 1999) ๐ 84 Days (FIDIC 2017)
3๏ธโฃ Engineer's Determination
โโโโโโโโโโโโโโ
๐ฏ Top 5 FIDIC Clauses Every Engineer Should Memorize
โ Clause 2.1 โ Access to Site โ Clause 4.12 โ Physical Conditions โ Clause 8.4/8.5 โ EOT โ Clause 13 โ Variations โ Clause 20.1/20.2 โ Claims Procedure
๐พ SAVE | โค๏ธ LIKE | ๐ SHARE
Follow for more Civil Engineering, Planning, QS, Contracts & FIDIC content.