06/18/2026
This is what 18 days of continuous grading looks like from the top side. JD 650C pushing the final grade on a large hillside cut in Western Colorado. We came in with raw terrain and walked off with a dead-level pad overlooking that valley.
People see the finished pad and think it was easy. They do not see the survey work, the cut calculations, the compaction passes, or the hours spent reading the slope to get the final grade right. This is what 3rd generation experience looks like on a site like this.
Western Colorado. | (970) 433-5750
Share this with anyone who is planning a large hillside build and does not yet have an excavator they trust.
Follow Grizzly Grading & Excavation for more from the field.
At the end of the day the dirt doesn't lie.