Another one☝🏼50’x100’ pad knocked out for F7 Construction. Topsoil stripped, engineered select fill laid in lifts and ro...
05/05/2026

Another one☝🏼
50’x100’ pad knocked out for F7 Construction. Topsoil stripped, engineered select fill laid in lifts and rolled with padfoot packer, and rough graded with the topsoil that was stripped from under the pad.
💥Our pads are built to last💥

Topsoil stripped off. Need a little more soil prep and will be ready to lay down some select fill. This shop will be 50’...
04/21/2026

Topsoil stripped off. Need a little more soil prep and will be ready to lay down some select fill. This shop will be 50’.x100’

Another driveway in the books this week. Pleased with how this turned out.
02/21/2026

Another driveway in the books this week. Pleased with how this turned out.

Big thank you to Glenn Polk Chevrolet of Sanger for the work. Over 20,000 square feet of parking went in. Started with o...
02/13/2026

Big thank you to Glenn Polk Chevrolet of Sanger for the work. Over 20,000 square feet of parking went in. Started with oversize rock, followed by a coat of flex base, then capped with asphalt millings. Built to last.

Running wide open. Very thankful for all this work.
02/11/2026

Running wide open. Very thankful for all this work.

Beat the weather this time. Got sub base spread and packed in. Ready for a little fine grading, then a coating of asphal...
01/22/2026

Beat the weather this time. Got sub base spread and packed in. Ready for a little fine grading, then a coating of asphalt millings🔥. This parking lot is built to last!

Hustling into the new year. Thank you to everyone for the continued support. Looking forward to 2026.
12/31/2025

Hustling into the new year. Thank you to everyone for the continued support. Looking forward to 2026.

🔥Fresh asphalt millings🔥These aren’t the easiest to come by, especially this quality. Let’s get you set up!
12/04/2025

🔥Fresh asphalt millings🔥

These aren’t the easiest to come by, especially this quality. Let’s get you set up!

09/30/2025

Anything worth doing, is worth over-doing.
Let’s do your project right, the first time.

Quick rock job for Prime Pump and Supply. Added some rock for trailer parking, and repaired the transition to the highwa...
08/21/2025

Quick rock job for Prime Pump and Supply. Added some rock for trailer parking, and repaired the transition to the highway up front.

Address

Myra, TX
76253

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm
Saturday 8am - 6pm

Telephone

+19407364266

Website

Alerts

Be the first to know and let us send you an email when Grewing Dirt Work posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share