TCL Consulting TCL Consulting provides high-quality GPS machine control models and material takeoffs for civil construction projects.
(1)

We are committed to precision, accuracy, and efficient project delivery.

𝗜𝗳 𝘆𝗼𝘂 𝗳𝗶𝘅 𝗲𝗾𝘂𝗶𝗽𝗺𝗲𝗻𝘁 𝘄𝗮𝗶𝘁𝗶𝗻𝗴 𝗼𝗻 𝘁𝗿𝘂𝗰𝗸𝘀, 𝘆𝗼𝘂𝗿 𝘄𝗵𝗼𝗹𝗲 𝗱𝗮𝘆 𝗿𝘂𝗻𝘀 𝘀𝗺𝗼𝗼𝘁𝗵𝗲𝗿.Some problems don't show up until the site gets bus...
03/28/2026

𝗜𝗳 𝘆𝗼𝘂 𝗳𝗶𝘅 𝗲𝗾𝘂𝗶𝗽𝗺𝗲𝗻𝘁 𝘄𝗮𝗶𝘁𝗶𝗻𝗴 𝗼𝗻 𝘁𝗿𝘂𝗰𝗸𝘀, 𝘆𝗼𝘂𝗿 𝘄𝗵𝗼𝗹𝗲 𝗱𝗮𝘆 𝗿𝘂𝗻𝘀 𝘀𝗺𝗼𝗼𝘁𝗵𝗲𝗿.

Some problems don't show up until the site gets busy.
That's when you find out if access, haul routes, and staging were thought through.
A small change in where you dump, load, or stage can save hours across a week.
The goal is fewer touch points, fewer surprises, and fewer days spent fixing yesterday's mess.

What slows you down most right now: access, staging, or truck flow?

https://tclconsulting.net/

03/27/2026

𝗠𝗼𝘃𝗶𝗻𝗴 𝗺𝗮𝘁𝗲𝗿𝗶𝗮𝗹 𝗲𝗳𝗳𝗶𝗰𝗶𝗲𝗻𝘁𝗹𝘆 𝗶𝘀 𝗼𝗻𝗲 𝗼𝗳 𝘁𝗵𝗲 𝗯𝗶𝗴𝗴𝗲𝘀𝘁 𝗰𝗵𝗮𝗹𝗹𝗲𝗻𝗴𝗲𝘀 𝗼𝗻 𝗮 𝗱𝗶𝗿𝘁 𝗷𝗼𝗯.

If material moves too far, fuel costs increase and production slows.

If material piles up in the wrong area, crews spend time rehandling it later.

Good planning helps contractors move material the shortest distance possible.

That keeps trucks moving and machines productive.

Understanding where material will go before work begins helps avoid wasted time.

How does your crew plan material movement across large sites?



www.tclconsulting.net

𝗧𝗵𝗶𝘀 𝗶𝘀 𝗵𝗼𝘄 𝗮 𝗰𝗹𝗲𝗮𝗻 𝗱𝗮𝘆 𝘁𝘂𝗿𝗻𝘀 𝗶𝗻𝘁𝗼 𝗮 𝗺𝗲𝘀𝘀: 𝗽𝗿𝗼𝗼𝗳𝗿𝗼𝗹𝗹 𝗮𝗻𝗱 𝘀𝗼𝗳𝘁 𝘀𝘂𝗯𝗴𝗿𝗮𝗱𝗲.On paper, it looks simple.In the field, it turns ...
03/27/2026

𝗧𝗵𝗶𝘀 𝗶𝘀 𝗵𝗼𝘄 𝗮 𝗰𝗹𝗲𝗮𝗻 𝗱𝗮𝘆 𝘁𝘂𝗿𝗻𝘀 𝗶𝗻𝘁𝗼 𝗮 𝗺𝗲𝘀𝘀: 𝗽𝗿𝗼𝗼𝗳𝗿𝗼𝗹𝗹 𝗮𝗻𝗱 𝘀𝗼𝗳𝘁 𝘀𝘂𝗯𝗴𝗿𝗮𝗱𝗲.

On paper, it looks simple.
In the field, it turns into trucks waiting, equipment boxed in, and material getting moved twice.
Most days don't fall apart from one big mistake. They fall apart from small bottlenecks stacking up.
When you remove one bottleneck early, the whole day runs smoother and crews stop stepping on each other.

Where do you lose the most time: waiting, rehandling, or cleanup?

https://tclconsulting.net/

03/27/2026

𝗡𝗲𝗲𝗱 𝗮 𝗺𝗼𝗱𝗲𝗹 𝘁𝗵𝗮𝘁 𝗺𝗮𝘁𝗰𝗵𝗲𝘀 𝗳𝗶𝗲𝗹𝗱 𝗳𝗹𝗼𝘄, 𝗻𝗼𝘁 𝗷𝘂𝘀𝘁 𝘁𝗵𝗲 𝗽𝗹𝗮𝗻𝘀?

We build 3D machine control models that follow plan intent and real field flow.
We also provide earthwork and material takeoffs so you can bid faster and plan smarter.
If plans are missing details, we call it out early so you're not guessing in the dirt.
You get clearer targets, cleaner quantities, and fewer surprises once the job is moving.

If you want help on an upcoming project, the link is below.
What do you build most right now: commercial pads, subdivisions, or civil site work?

https://tclconsulting.net/

𝗧𝗵𝗲 𝗾𝘂𝗶𝗰𝗸𝗲𝘀𝘁 𝗲𝘀𝘁𝗶𝗺𝗮𝘁𝗲-𝘁𝗼-𝗳𝗶𝗲𝗹𝗱 𝗵𝗮𝗻𝗱𝗼𝗳𝗳 𝘁𝗵𝗮𝘁 𝗮𝗰𝘁𝘂𝗮𝗹𝗹𝘆 𝘄𝗼𝗿𝗸𝘀.1) Confirm today's work area and end target.2) Confirm haul r...
03/26/2026

𝗧𝗵𝗲 𝗾𝘂𝗶𝗰𝗸𝗲𝘀𝘁 𝗲𝘀𝘁𝗶𝗺𝗮𝘁𝗲-𝘁𝗼-𝗳𝗶𝗲𝗹𝗱 𝗵𝗮𝗻𝗱𝗼𝗳𝗳 𝘁𝗵𝗮𝘁 𝗮𝗰𝘁𝘂𝗮𝗹𝗹𝘆 𝘄𝗼𝗿𝗸𝘀.

1) Confirm today's work area and end target.
2) Confirm haul route, dump zone, and where stockpiles go.
3) Confirm what area stays clean for base/fine grade.
4) Confirm who owns grade checks and when they happen.
5) Confirm deliveries and traffic plan so trucks keep cycling.

This takes minutes, but it saves hours when the job is moving fast.

Which step gets skipped most when the site is busy?

https://tclconsulting.net/

𝗘𝘃𝗲𝗿𝘆 𝗰𝗼𝗻𝘁𝗿𝗮𝗰𝘁𝗼𝗿 𝗵𝗮𝘀 𝗮 𝗷𝗼𝗯 𝘁𝗵𝗲𝘆 𝗹𝗲𝗮𝗿𝗻𝗲𝗱 𝗮 𝗯𝗶𝗴 𝗹𝗲𝘀𝘀𝗼𝗻 𝗳𝗿𝗼𝗺.Maybe the dirt balance was wrong.Maybe the site had unexpected...
03/26/2026

𝗘𝘃𝗲𝗿𝘆 𝗰𝗼𝗻𝘁𝗿𝗮𝗰𝘁𝗼𝗿 𝗵𝗮𝘀 𝗮 𝗷𝗼𝗯 𝘁𝗵𝗲𝘆 𝗹𝗲𝗮𝗿𝗻𝗲𝗱 𝗮 𝗯𝗶𝗴 𝗹𝗲𝘀𝘀𝗼𝗻 𝗳𝗿𝗼𝗺.

Maybe the dirt balance was wrong.

Maybe the site had unexpected soil conditions.

Maybe the grading plan created problems later in the project.

Those lessons shape how crews approach the next job.

Experienced contractors carry those lessons forward and adjust their planning.

Mistakes are never fun, but they often lead to better systems later.

What job taught you the biggest lesson in your career?



www.tclconsulting.net

03/26/2026

𝗧𝗿𝘂𝗰𝗸 𝗰𝘆𝗰𝗹𝗲 𝘁𝗶𝗺𝗲 𝗾𝘂𝗶𝗲𝘁𝗹𝘆 𝗰𝗼𝗻𝘁𝗿𝗼𝗹𝘀 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻.

If trucks take too long to return, machines sit waiting.

If trucks arrive too quickly, they start stacking up.

The best operations find the right balance.

Loading speed, haul distance, and dump time all play a role.

Small improvements in truck cycle time can increase production more than adding more equipment.

What usually affects truck cycle time the most on your projects?



www.tclconsulting.net

03/26/2026

𝗦𝘁𝗶𝗹𝗹 𝗴𝘂𝗲𝘀𝘀𝗶𝗻𝗴 𝗶𝗻 𝘁𝗵𝗲 𝗱𝗶𝗿𝘁? 𝗖𝗹𝗲𝗮𝗻 𝗺𝗼𝗱𝗲𝗹𝘀 𝗳𝗶𝘅 𝘁𝗵𝗮𝘁 𝗳𝗮𝘀𝘁.

If you've ever lost time from bad data, you already know the pain.
We focus on buildable models, clear quantities, and fast communication.
If something in the plans doesn't make sense, we flag it early.
That keeps the field from guessing and keeps the schedule from drifting.

If you want a quick look at a set before you bid, the link is below.
What's your biggest headache this month: staging, traffic flow, or finish grade?

https://tclconsulting.net/

𝗧𝗵𝗲 𝗳𝗶𝗿𝘀𝘁 𝗿𝗮𝗶𝗻 𝗼𝗻 𝗮 𝗻𝗲𝘄 𝗴𝗿𝗮𝗱𝗶𝗻𝗴 𝗷𝗼𝗯 𝘁𝗲𝗹𝗹𝘀 𝘆𝗼𝘂 𝗮 𝗹𝗼𝘁.You start to see how water moves across the site.Low spots show up.D...
03/25/2026

𝗧𝗵𝗲 𝗳𝗶𝗿𝘀𝘁 𝗿𝗮𝗶𝗻 𝗼𝗻 𝗮 𝗻𝗲𝘄 𝗴𝗿𝗮𝗱𝗶𝗻𝗴 𝗷𝗼𝗯 𝘁𝗲𝗹𝗹𝘀 𝘆𝗼𝘂 𝗮 𝗹𝗼𝘁.

You start to see how water moves across the site.

Low spots show up.
Drainage paths become clear.
Soft areas begin to develop.

Sometimes those problems reveal issues that were not obvious before.

That is why experienced crews watch the site closely after the first big rain.

It helps them understand what adjustments might be needed.

What problems usually show up on your sites after the first storm?



www.tclconsulting.net

03/25/2026

𝗚𝗼𝗼𝗱 𝗰𝗿𝗲𝘄𝘀 𝘁𝗿𝘆 𝘁𝗼 𝘀𝘁𝗮𝘆 𝗼𝗻𝗲 𝘀𝘁𝗲𝗽 𝗮𝗵𝗲𝗮𝗱 𝗼𝗳 𝘁𝗵𝗲 𝗷𝗼𝗯.

They prepare the next area before the current one finishes.

They build haul routes early.
They stage material where it will be needed later.
They plan equipment movement across the site.

That kind of planning keeps machines working instead of waiting.

When crews work ahead, the entire job flows better.

When they react instead of planning, delays start stacking up.

How far ahead does your crew usually plan the next phase of work?



www.tclconsulting.net

𝗙𝗮𝘀𝘁𝗲𝗿 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝘀𝘁𝗮𝗿𝘁𝘀 𝘄𝗶𝘁𝗵 𝗰𝗹𝗲𝗮𝗿𝗲𝗿 𝘁𝗮𝗿𝗴𝗲𝘁𝘀.If you've ever lost time from bad data, you already know the pain.We focus...
03/25/2026

𝗙𝗮𝘀𝘁𝗲𝗿 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝘀𝘁𝗮𝗿𝘁𝘀 𝘄𝗶𝘁𝗵 𝗰𝗹𝗲𝗮𝗿𝗲𝗿 𝘁𝗮𝗿𝗴𝗲𝘁𝘀.

If you've ever lost time from bad data, you already know the pain.
We focus on buildable models, clear quantities, and fast communication.
If something in the plans doesn't make sense, we flag it early.
That keeps the field from guessing and keeps the schedule from drifting.

If you want pricing or want to send a plan set over, the link is below.
What do you build most right now: commercial pads, subdivisions, or civil site work?

https://tclconsulting.net/