10/08/2026
What a difference a week makes.
We started this commercial job in Plaistow, NH last week for SGI Group.
Trees cut, erosion control installed, stumps pulled and hauled out, loam stripped back and hauled out, several existing dry wells and septic tanks removed, 2300sf addition dug, small room on rear of building demolished.
Back in a few days to backfill the foundation.