10/04/2026
Another big one wrapped up. 🚜
This project involved a little bit of everything — challenging grades that needed to be corrected and blended into the existing property, bringing in fill to build areas up, installing gutter drainage 💧, and finishing everything off with a substantial amount of fresh loam and prepped for hydroseed. 🌱
Jobs like this are where the details really matter. Getting the elevations right, making sure water has somewhere to go, and tying the new grades into the existing property so everything looks like it belongs there.
A lot of material moved and a lot of hours into this one, but a huge transformation from where we started. 💪