13/10/2026
Progress on site as we undertake the construction, fabrication, and loading of vat leach tanks for a hydrometallurgical processing circuit.
The vats are being constructed to facilitate controlled ore loading, leaching, and solution collection, with each stage designed to support efficient metal recovery.
From engineering design to fabrication and site installation — building practical mineral-processing solutions.
Visit us at Mukute today
Office 📍 No.9 37th Avenue Mabelreign Harare
Workshop 📍 5389 Davies Road Prospect Industrial Area Waterfalls Harare
📞+263 78 125 2493/+263 78 371 7233 / +263 77 658 2471