06/05/2026
๐ฟ๐ง Drainage brought back under control.
We recently completed clean up works at Great Southern TAFE, removing built up vegetation and silt that was restricting flow and making the area difficult to manage.
The aim was to open the drain back up, improve water movement, restore access along the edge, and leave the site in a condition that can be maintained properly moving forward.
A practical job, but an important one before the next run of wet weather.