11/08/2026
Deanside Primary School's Field of Play was designed and built to handle everything a school throws at it: PE classes, lunchtime games, and weekend community use, all year round.
The field was one of several SPORTENG assessed and supported as part of ongoing work with the Victorian School Building Authority (VSBA), with the brief to ensure the field could sustain the school's forecast use through every season.
An agronomic investigation found the existing growing medium had high silt and clay content and low hydraulic conductivity, resulting in poor drainage. SPORTENG recommended a staged improvement plan over three years, combining imported sand and additional drainage to improve the soil profile.
SPORTENG was also engaged to assist the school with witness and hold point inspections throughout the project, as maintaining quality control of imported sand is critical to a project's success.
Ongoing maintenance remains key to ensuring the field stays at a high quality for years to come.