13/10/2026
Finally finished our latest client testimonial video for Mister Epoxy π
This project took us about 3 months to complete due to other renovations that were happening at the property. First two days of filming were the preparation of the surface which took a whole day of grinding the old tile glue off the concrete surface. Second day was further preparation and then the final laying of the Epoxy floor coating.
We then had to wait for the new kitchen to be installed and final redecoration of the spaces. Once this was complete would could then go back to film the testimonial and the final finished product.
Home owner was over the moon about the quality of the workmanship and final result. Mister Epoxy was ecstatic about the finished video so now he can use it to promote his business.
We wish Mister Epoxy future success and look forward to working with him again in the near future π
(This video was filmed entirely on the Canon C400)