30/08/2026
Glass Outlet's Ipswich facility in Brisbane operates as a high-volume industrial distribution site, where customers and staff regularly work close to forklifts, cranes, and other material-handling vehicles while picking and packing orders.
As part of the facility upgrades, Glass Outlet engaged Barrier Group to consult on appropriate safety solutions, commencing with an on-site assessment conducted by a dedicated Barrier Group Account Manager.
In line with the key project requirements, the FlexGuard™ Polymer Barrier System was recommended as the most suitable asset protection solution. Its modular design enables efficient logistics and installation with minimal disruption to site operations, helping reduce installation time and minimise operational downtime for the client. Additionally, the FlexGuard™ Polymer Barrier System provides a lower total cost of ownership by reducing ongoing maintenance requirements and minimising potential damage to both the facility floor and vehicles in the event of an impact.
For Glass Outlet, working with Barrier Group provided a seamless process from initial site assessment through to installation and project sign-off. Barrier Group's signature turn-key approach brought the required safety solutions together under a single project, delivering a faster turnaround with minimal disruption to day-to-day operations.
The result was an integrated safety solution designed to protect people, infrastructure and operations while providing Glass Outlet with the flexibility to adapt safety controls as site requirements change.
Read the full case study: https://shorturl.at/ixaBn