15/10/2026
Mine operators need crushers, screens, transfer points, conveyors and access systems to work together as one complete process. Transfer geometry and conveyor loading influence material control, wear and long-term maintenance requirements.
This MAX Plant iron ore system was designed around how material moves through the entire circuit, from crushing and screening through to conveying, stockpiling and final product.
MAX Plant starts with the ore, required products, site layout and operating requirements, then develops the equipment arrangement around the complete process.
Every section has a defined role, and every connection is designed with the next stage in mind.