18/08/2025
STE Engineering was engaged by GGC to support the delivery of a large-scale solar farm, providing specialized fabrication and assembly services critical to the project’s infrastructure.
Our team was responsible for several key components that ensured structural integrity and long-term performance under challenging ground conditions.
The scope of works included:
•Fabrication of foundations for overhead transmission lines.
•Fabrication of steel liners to support transmission structures on soft ground.
•Fabrication of reinforcement cages for the substation.
•Assembly of rag bolt assemblies for the overhead transmission lines.
The project was delivered smoothly, on schedule, and to a high standard of quality.
Working alongside GGC was a highly positive experience, marked by strong collaboration, clear communication, and a shared commitment to excellence.