STE Engineering

Call Directions Website Contact the business

STE Engineering Food Grade Stainless Steel Engineering and General Engineering

New look for the STE team👌Looking sharp thanks to Exposed Signage and Apparel
12/08/2026

New look for the STE team👌

Looking sharp thanks to Exposed Signage and Apparel

Fresh embroidery for STE Engineering 👌

Their updated logo stitched onto their new uniforms and ready for the team.

Before & AfterFrom steel frame to a modern facade. Another project proudly completed in Adelaide.Well done to the team o...
25/06/2026

Before & After

From steel frame to a modern facade. Another project proudly completed in Adelaide.

Well done to the team on another outstanding result 👌

Been a solid start to the year with big and small jobs on the go, shaping up to be a busy one. Thanks to all our valued ...
09/04/2026

Been a solid start to the year with big and small jobs on the go, shaping up to be a busy one.

Thanks to all our valued customers for the continued support.

STE Engineering will be closed on Monday, 9th of March due to the public holiday. We will reopen and return to normal op...
06/03/2026

STE Engineering will be closed on Monday, 9th of March due to the public holiday. We will reopen and return to normal operating hours on Tuesday.
We wish everyone a safe and enjoyable long weekend. ☀️

STE Engineering Christmas Trading Hours: 🎅🎄We will be closing at 1pm on Friday the 19th of December 2025 and re-open Mon...
09/12/2025

STE Engineering Christmas Trading Hours: 🎅🎄

We will be closing at 1pm on Friday the 19th of December 2025 and re-open Monday the 5th of January 2026.

We want to thank all our Customers & Suppliers and wish everyone a Merry Christmas and a Happy New Year. 🎉

Kmart Prime Build;The Kmart conversion project involved drafting, workshop fabrication and installation of steel members...
27/10/2025

Kmart Prime Build;

The Kmart conversion project involved drafting, workshop fabrication and installation of steel members to support and strengthen the structural integrity of existing buildings.

Installation included structural steel members supporting the ceiling structure and remaining walls, replacing approximately 59m of precast concrete and brickwork walls.

A new structural entrance portal was also drafted, fabricated and installed to support new signage, display and roller shutter systems.

Approximately 10.5T of structural steelwork has been installed throughout the project.

Amazing effort from everyone involved 👍

STE Engineering was engaged by GGC to support the delivery of a large-scale solar farm, providing specialized fabricatio...
18/08/2025

STE Engineering was engaged by GGC to support the delivery of a large-scale solar farm, providing specialized fabrication and assembly services critical to the project’s infrastructure.
Our team was responsible for several key components that ensured structural integrity and long-term performance under challenging ground conditions.


The scope of works included:

•Fabrication of foundations for overhead transmission lines.

•Fabrication of steel liners to support transmission structures on soft ground.

•Fabrication of reinforcement cages for the substation.

•Assembly of rag bolt assemblies for the overhead transmission lines.

The project was delivered smoothly, on schedule, and to a high standard of quality.
Working alongside GGC was a highly positive experience, marked by strong collaboration, clear communication, and a shared commitment to excellence.

Boning Room Upgrade for Tasmania quality meats (TQM) •TQM came to STE wanting to improve the output by at least 50% to i...
29/07/2025

Boning Room Upgrade for Tasmania quality meats (TQM)

•TQM came to STE wanting to improve the output by at least 50% to improve ergonomics for their employees, and to also minimise the clean up time.

•STE designed, drafted, manufactured and installed the upgraded conveyer system including all electrical fitouts, programming, mechanical and automation components for the TQM boning room.

•The new processing line is 170 meters with 24 conveyors (using 355 meters of belt).

Fantastic effort from everyone!

Malcolm Seymour  15.01.1959-31.01.2025We remember and honour Mal Seymour, a valued member of the STE Engineering team fo...
03/06/2025

Malcolm Seymour 15.01.1959-31.01.2025

We remember and honour Mal Seymour, a valued member of the STE Engineering team for 6 years. Mal’s unwavering work ethic and dedication were evident in everything he did. Always willing to lend a hand, no matter the task, Mal’s presence at STE Engineering was a constant source of support and positivity.

We will continue in Legacy of Mal here at STE to make sure every job is “Malisfying “ (as Mal would say)

Though Mal may no longer be with us, his legacy of commitment and generosity will remain a lasting part of the STE Engineering family.
We will continue to remember and be inspired by Mal's example every day.

Address

4 Hynes Court
Mildura, VIC
3500

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 12pm

Telephone

+61350220677

Alerts

Be the first to know and let us send you an email when STE Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to STE Engineering:

Shortcuts

Share