22/10/2025
Built to Last on the Manning River
Located in Taree along the Manning River, this project involved replacing flood-damaged infrastructure with a new design engineered to withstand a 1% (100-year) flood event.
The structure was recently tested by a one-in-500-year flood and held strong — proving the durability and longevity of our work.
The previous seawall had failed due to undermining and erosion, so this rebuild ensures the site is now properly stabilised and built to last.