26/09/2024
The team at Precision deliver another successfully Production Bore!
The job intailed the replacement of a 6inch Production Bore for a valued client in the Swan Valley region of Perth.
The Original Bore was drilled back in the early 70s and the steel casing had corroded.
The original bore pump was removed and the bore casing reamed out and cleaned up back to depth and decommissioned inline with the minimum Bore construction standards.
The team then carried out drilling the new Bore with rotary mud down to the same depth the existing well was replacing like for like, the team drilled to a total of 140m with downhole Gamma carried out prior to this installation of the casing.
This Bore was constructed with a combination of stainless steel screens and class 12 PVC back to surface.
At Precision, we pride ourselves on our diverse drilling services tailored to meet the unique needs of various industries. If you’re gearing up for a drilling campaign, let’s connect! Discover how our expertise can ensure your project’s success.
Learn more about Precision’s achievements and how we can help you:
https://lnkd.in/gptxVPq
"