10/16/2026
Beautiful weather, a great team, and another successful lift completed.
Watch as one of three identical 800 kW natural gas generators in a skintight enclosure is carefully positioned onto the truck before heading to site. Rated at 600V, 60Hz, 3 Phase, 4 Wire, these units will provide reliable backup power when it matters most.
Projects like this are made possible through the dedication and coordination of our logistics team, crane operators, drivers, project managers, and field crews. From transportation to final placement, every step requires careful planning and ex*****on.
A big thank you to everyone involved in making this project a success. Great work, team.
www.paramountpower.com