AMC Environmental Corp

Directions Website Contact the business

AMC Environmental Corp With over 15 years of expertise, AMC Environmental Corp. provides safe, efficient, and professional demolition and environmental services across Ontario.

We specialize in demolition, selective demolition, asbestos removal, mold remediation, and more

Drywall is booked for Monday. Has anyone checked what’s behind it?After a fire or water job, the damage you can see is r...
2026-11-04

Drywall is booked for Monday. Has anyone checked what’s behind it?

After a fire or water job, the damage you can see is rarely all of it. The pressure to get walls closed and the schedule moving is exactly when the hidden problems get sealed in.

Wet framing, drywall that feels dry, insulation that soaked up smoke, and wiring that took heat or water can all look fine on the surface. Once new drywall and paint go over them, nobody sees them again until the smell or the stains show up.

That usually happens mid-rebuild, and it’s usually the GC who gets the call. Checking before the walls close is what keeps the job moving.

Comment RESTORE and we’ll get your site assessed before anything gets rebuilt.

📍Fire & Water Restoration, Toronto & GTA

2026-11-03

What’s the last thing that happens on a demo site before the builder takes over?

Day three in Forest Hill and the house is fully down. The excavator’s heavy work is done, and what’s left is the part that doesn’t look like much on camera, which is cleaning up the loose ends across the lot so it’s ready to hand over.

The lot sits right beside neighbouring homes, so a tidy finish matters here.

Once it’s clean, Pine Glen Custom Homes and Coivic take it from there and keep the build moving.

📍House Demolition, Forest Hill, Toronto

2026-11-02

What happens the day after the air tests pass on an abatement job?

The crew goes in and gets to work.

This is Heartwood Renovations site. We passed our air tests for abatement, the guys started demo two days before this check-in, and we’re roughly 70% through.

You’d think being down to the framing means you’re basically done. Not even close.

The flooring still has to come out, along with the plastic we put up to protect some areas. Then everything gets cleaned out from the top down, including the plaster stuck in the cavities, the scraps of insulation, and yes, the inside of the HVAC.

After that it’s walls, then floors, and the very last job is de-nailing the whole frame, top to bottom.

It’s not the exciting part of demo, but it’s what decides what the next trade walks into.

Comment DEMO and we’ll get your next demo scoped and moving.

📍Interior Demolition, Mississauga

2026-10-30

Two days in, the house is already on the ground.

Now it’s a loop: the excavator loads a bin, a truck hauls it away, the next one pulls in, and someone on the street keeps traffic moving.

This Forest Hill teardown for Pine Glen Custom Homes and Coivic has moved into the clear-out stage. The debris is coming off the lot load by load, and what’s left behind is bare ground ready for whatever they build next.

Demolition from the first swing to the last load, handled by us start to finish.

Planning a house demo? Let us take the hard part off your hands.

📍Full House Demolition, Forest Hill, Toronto

How many of the four did you know?First, you can’t tell by looking whether insulation contains asbestos. Only a lab test...
2026-10-29

How many of the four did you know?

First, you can’t tell by looking whether insulation contains asbestos. Only a lab test can confirm it, and not all old insulation has it, so testing is how you find out which situation you’re in.

Second, damaged insulation also stops doing its job. Wet or pest-damaged insulation insulates poorly, so a drafty room or high heating bills can be a sign something’s off up there.

Third, even a quick DIY pull can put fibres in the air, and a regular dust mask won’t protect you from asbestos. That’s the main reason this job is better left to people set up for it.

Fourth, whoever comes next, whether that’s an HVAC crew or an attic conversion, needs a clear, clean space to start in. That makes removal the one job worth lining up first.

None of it is visible from the attic hatch, which is why it’s worth knowing before the work starts.

Comment ATTIC and we’ll get your removal scheduled before your next project starts.

📍Insulation Removal, Toronto & GTA

2026-10-28

What’s left of a house after two weeks of demolition? Mostly sky.

We’re in week two of this Kleinburg gut and rebuild, and honestly, the house barely looks like a house anymore.

The roof is completely off and the inside is totally gutted, so if you look at it from the drone, you can see straight down into it.

Now the crew has moved outside to work with the excavation team. The concrete pad in the back is coming up, the garage is coming down, and we’ve started digging for the new foundation.

There’s just a little debris left to haul out of the house. We’re on go time.

Got a gut and rebuild coming up? DM DEMO and we’ll book a walkthrough of your site.

📍Demolition, Kleinburg

Most people don’t notice one big sign. They notice a handful of small ones, in different rooms, and brush off each one o...
2026-10-27

Most people don’t notice one big sign. They notice a handful of small ones, in different rooms, and brush off each one on its own.

The basement smell is “just an old house thing.” The bathroom paint is “probably steam.” That stain upstairs has “always been there.” Every excuse makes sense on its own. But a few of them showing up around the house at once usually isn’t a coincidence.

None of this means something’s definitely wrong. It just means it’s worth actually checking instead of shrugging it off room by room.

Comment MOLD and we’ll get your home checked before it becomes a bigger job.

📍Home Inspection, Toronto & GTA


2026-10-26

Day 1 in Forest Hill. The excavator is in and the full house demolition is underway.

By day 3, this lot will be cleared and ready for the new build.
Controlled, efficient, and on schedule. That’s how every teardown should go.

Guess how many bins it’ll take to haul away everything this house leaves behind. Drop your number below. We’ll reveal the answer on day 3.

Follow along for days 2 and 3. Got a teardown coming up? DM us for a timeline.

📍 Forest Hill, Toronto

2026-10-23

4,500 sq ft of drywall. Every sample came back positive for asbestos.

Mississauga project with Heartwood Renovations , run in two phases.

Phase 1 is abatement. The joint compound tested positive across the basement and main floor, which makes this a Type 2 removal under Ontario regs. Before anything comes off the walls, the prep has to be right. Instead of building separate containments for the basement and the upstairs addition, we tied it all into one zone. One setup, one controlled work area, one clearance at the end, and no risk of cross-contamination moving between floors.

Phase 2 starts only after abatement is done and clearance passes. Then it’s a full gut. Back to studs, back to subfloor, and the basement goes all the way back to base. Everything is going out.

We handle the full scope in-house: testing, abatement, clearance, and demolition. One crew from first sample to bare studs, so your project never waits on a handoff between subs.

Need testing for your next project? DM us “TEST” and we’ll get samples done faster then you can finish quoting the job

amcenvironmentalcorp.com
416-533-4114

Most people don’t renovate an old house thinking about what’s inside the walls. They’re thinking about the after photos....
2026-10-21

Most people don’t renovate an old house thinking about what’s inside the walls. They’re thinking about the after photos.

Which makes sense. Nobody’s picturing a lab sample when they’re picturing a finished basement.

The stuff that carries risk in older homes wasn’t some shortcut someone took. It was just normal for decades, insulation, flooring, ceilings, pipe wrap, all of it. Normal then. Worth checking now.

You don’t need to know exactly what you’re looking at. You just need it tested before the sledgehammer comes out.

Comment SAFE and we’ll get your home tested before your reno starts.

📍Asbestos Testing, Toronto & GTA


Address

187 Caledonia Road
Toronto, ON
M6E4S9

Opening Hours

Monday 8am - 7pm
Tuesday 8am - 7pm
Wednesday 8am - 7pm
Thursday 8am - 7pm
Friday 8am - 7pm
Saturday 9am - 3pm

Alerts

Be the first to know and let us send you an email when AMC Environmental Corp posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AMC Environmental Corp:

Shortcuts

Share

Nearby businesses