18/08/2026
Too many parts and suppliers to manage during product development?
For many product development teams, getting prototypes and low-volume parts made can take more time than expected.
Different parts may require different processes — CNC machining, sheet metal fabrication, 3D printing, tooling, injection molding, and surface finishing.
Finding the right suppliers, checking drawings, comparing quotes, and following up production all take time.
This is where I can help.
As a China-based tooling and manufacturing engineer, I support overseas product teams with:
DFM and engineering support
3D/2D drawing preparation
Sheet metal drawings and BOM preparation
CNC machining and sheet metal fabrication
Prototyping and 3D printing
Injection molding and tooling
Supplier sourcing and production follow-up
You send me your drawings, 3D models, or requirements.
I help review the design, choose the right manufacturing process, find suitable suppliers, and follow the project through production.
One engineering contact in China, from design to prototype and low-volume production.