Fishburn Heavy Fabrication

Fishburn Heavy Fabrication Steel Fabrication

We are so happy and proud to announce this!Fishburn Heavy Fabrication Appointed Exclusive China Distributor for BYG Futu...
25/04/2025

We are so happy and proud to announce this!

Fishburn Heavy Fabrication Appointed Exclusive China Distributor for BYG Futura™ Wear-Part Range

[Wollongong, NSW | Barcelona, ES | Beijing, CN — 23 April 2025] — Fishburn Heavy Fabrication (FHF) is proud to announce that it has been granted sole and exclusive distribution rights for mainland China for the complete BYG Futura™ range of ground-engaging tools (GET) and bucket-protection systems.

“Chinese mine operators and large-scale earthmovers are demanding faster change-outs, longer service life, and verifiable reductions in cost per tonne,” said James David Fishburn, Director of Fishburn Heavy Fabrication. “With Futura’s hammerless locking technology and up to 20 percent more usable wear metal compared with conventional GET, we can now offer exactly that — backed by FHF’s fabrication expertise and nationwide support network.”

Why Futura™ sets a new benchmark
Hammer-free installation — tool-less pin systems improve workplace safety and cut downtime during tooth changes.

BYG Extended wear life — proprietary alloy design and heavier nose geometry deliver a proven increase in service hours for loaders, excavators, and rope shovels.

BYG Full portfolio coverage — teeth, adapters, lip shrouds, wing shrouds, and wear caps for equipment from 1 t compact machines up to 800 t ultra-class miners.

Lifecycle economics — lower change-out frequency translates into measurable OPEX savings for high-abrasion coal, iron-ore, and quarry applications across China.

The final step of our tilting mud buckets assembly, head and cylinder installation.
01/03/2023

The final step of our tilting mud buckets assembly, head and cylinder installation.

Another successful container loading today, ready for the next one.
21/02/2023

Another successful container loading today, ready for the next one.

The factory is running at full speed again after our CNY break. Getting ready to load new containers soon.              ...
17/02/2023

The factory is running at full speed again after our CNY break. Getting ready to load new containers soon.

It's that time of the year again, getting everything prepared for Chinese New Year. We just had another gas delivery to ...
13/01/2023

It's that time of the year again, getting everything prepared for Chinese New Year. We just had another gas delivery to make sure we have everything needed for production when returning from the holidays.

Our cylinder storage is getting bigger and bigger, most of these are for the grabs and tilting mud buckets we're shippin...
12/01/2023

Our cylinder storage is getting bigger and bigger, most of these are for the grabs and tilting mud buckets we're shipping out next week.

Another order of drum style compaction wheels is ongoing.
10/01/2023

Another order of drum style compaction wheels is ongoing.

Another high durability rock bucket fully equipped with our updated wear package. Just needs its side cutters installed ...
06/01/2023

Another high durability rock bucket fully equipped with our updated wear package. Just needs its side cutters installed and it's ready for loading.

The new year is already a busy one, with multiple different grabs on order. These mechanical grabs are waiting for the b...
04/01/2023

The new year is already a busy one, with multiple different grabs on order. These mechanical grabs are waiting for the bushings and pins so the two sides can be put together.

It's scrap pickup time again. With production increasing, the more and more waste we get from the laser cutting and lath...
21/12/2022

It's scrap pickup time again. With production increasing, the more and more waste we get from the laser cutting and lathes. All off to be recycled.

And as we feared, it was raining during this container loading. Nonetheless the two containers were loaded successfully....
16/12/2022

And as we feared, it was raining during this container loading. Nonetheless the two containers were loaded successfully.

The roof over the loading bays is being dismantled so we can expand the loading bays during the new year. Hope it doesn'...
15/12/2022

The roof over the loading bays is being dismantled so we can expand the loading bays during the new year. Hope it doesn't rain when we have to load.

Address

No. 13. Haijing D**g 3rd Road
Xiamen

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00

Alerts

Be the first to know and let us send you an email when Fishburn Heavy Fabrication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fishburn Heavy Fabrication:

Share