17/08/2026
Coiled Tubing Operations JHA & 5×5 Risk Assessment
I’m pleased to introduce my new Coiled Tubing Operations JHA & 5×5 Risk Assessment playlist.
This six-video series breaks down a Coiled Tubing Acidizing operation step by step, focusing on key hazards, control measures, and practical JHA and 5×5 risk assessment principles.
🎯 The six videos cover:
Rig Up Coiled Tubing
Pressure Test BOP
Prepare & Handle Acid Chemicals
Running Coiled Tubing Into a Live Well
Acid Pumping
Equipment Recovery & Well Securing
The goal is to help drilling, well intervention, HSE, and operations professionals strengthen their understanding of hazard identification, risk controls, well-control barriers, and safe ex*****on.
🦺 Safety starts with identifying the hazards before the job begins.
🔗 Follow the link in the comment below to watch the full playlist.