ARB WIND

ARB WIND Wind Farm Services

๐Ÿ”ง Contract Award ARB Wind is delighted to have been awarded the contract for Balance of Plant (BoP) and Above Water Foun...
07/11/2025

๐Ÿ”ง Contract Award

ARB Wind is delighted to have been awarded the contract for Balance of Plant (BoP) and Above Water Foundations inspections at the Neart na Gaoithe (NnG Offshore Wind) Wind Farm.

The contract will see our teams support BoP & structural inspections across 54 turbines and two offshore substation platforms, ensuring long-term infrastructure integrity.

๐Ÿ“ Learn more: https://www.arbwind.co.uk/post/balance-of-plant-and-above-water-foundations-inspections-contract-award




EDF power solutions UK and Ireland ESB

๐•๐ž๐ฌ๐ญ๐š๐ฌ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐€๐ฐ๐š๐ซ๐ ๐€๐ง๐ง๐จ๐ฎ๐ง๐œ๐ž๐ฆ๐ž๐ง๐ญWeโ€™re proud to share that ARB has been awarded three new Vestas construction projects f...
09/05/2025

๐•๐ž๐ฌ๐ญ๐š๐ฌ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐€๐ฐ๐š๐ซ๐ ๐€๐ง๐ง๐จ๐ฎ๐ง๐œ๐ž๐ฆ๐ž๐ง๐ญ

Weโ€™re proud to share that ARB has been awarded three new Vestas construction projects for statutory inspections in 2025.

The sites โ€” ๐‚๐ซ๐ฒ๐ฌ๐ญ๐š๐ฅ ๐‘๐ข๐  4, ๐๐ž๐ง๐œ๐ฅ๐จ๐ž, ๐š๐ง๐ ๐“๐š๐œ๐ก๐ž๐ซ ๐–๐ข๐ง๐ ๐…๐š๐ซ๐ฆ๐ฌ, all located in Scotland โ€” represent a continued relationship with Vestas, building on three successful years of collaboration in wind farm construction statutory inspection services.

Thank you to the Vestas team for their continued trust in ARB. We're excited to support the next phase of renewable energy development in Scotland.

hashtag hashtag hashtag

Weโ€™re proud to share the successful demobilisation project with one of our valued offshore clients. Our teams safely and...
06/05/2025

Weโ€™re proud to share the successful demobilisation project with one of our valued offshore clients. Our teams safely and efficiently removed 51x temporary diesel generators from offshore assets onto an SOV and finally into port, a complex scope that required careful planning, precision engineering, and some creative problem-solving.

Working within tight logistical constraints, we utilised alternative lifting and transport methods to ensure minimal disruption to the site and surrounding infrastructure. Thanks to our experienced teams and a strong focus on safety, the operation was completed on time and incident-free.

A great example of how adaptability and teamwork deliver results โ€” even under tough conditions. ๐Ÿ’ช๐ŸŒฌ๏ธ


๐Ž๐ฉ๐ž๐ซ๐š๐ญ๐ข๐จ๐ง๐ฌ ๐‡๐ฎ๐› - ๐…๐ข๐Ÿ๐ž Weโ€™re kicking off 2025 with the launch of one of our new operations hubs, located at our HQ on the...
30/01/2025

๐Ž๐ฉ๐ž๐ซ๐š๐ญ๐ข๐จ๐ง๐ฌ ๐‡๐ฎ๐› - ๐…๐ข๐Ÿ๐ž

Weโ€™re kicking off 2025 with the launch of one of our new operations hubs, located at our HQ on the scenic Firth of Forth.

This hub will play a key role in supporting both Offshore and Onshore Wind Farms on the East Coast. Strategically placed, itโ€™s designed to meet our clients' needs, from engineering to spare parts storage.

Stay tuned!

See you all tomorrow in Glasgow at the Scottish Renewables Offshore Wind Conference.We will be exhibiting alongside our ...
21/01/2025

See you all tomorrow in Glasgow at the Scottish Renewables Offshore Wind Conference.

We will be exhibiting alongside our sister company Briggs Marine on stand F12. Our MD Arran Bell will be on hand to discuss our offshore services and how ARB can support your project from the stages of construction to O&M.

๐„๐ง๐-๐ญ๐จ-๐„๐ง๐ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ฎ๐ฉ๐ฉ๐จ๐ซ๐ญ From construction to O&M, ARB WINDs offshore engineering teams are constructed for efficiency...
13/01/2025

๐„๐ง๐-๐ญ๐จ-๐„๐ง๐ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ฎ๐ฉ๐ฉ๐จ๐ซ๐ญ

From construction to O&M, ARB WINDs offshore engineering teams are constructed for efficiency, ensuring a variety of skillsets are present to provide innovative cost-effective solutions.

Our proven track record spans over multiple wind farms providing engineering solutions to asset owners, WTG OEMs & EPCI Contractors.

Contact us today to learn about how ARB WINDs teams can support your project with the following services:

ยท Guano / Marine Growth Cleaning
ยท Statutory Inspections + Maintenance
ยท Above Waterline Structural Inspections
ยท Balance of Plant
ยท EPCI Snagging Management
ยท Internal TP Cleaning
ยท Bespoke Engineering / Lifting Solutions

Well done Mila ๐Ÿ‘๐Ÿผ
10/12/2024

Well done Mila ๐Ÿ‘๐Ÿผ

Well done to Mila Gibson on being awarded the November player of the month award for our Tiki Taka Under 8 Girls squad ๐Ÿ‘๐Ÿ‘๐Ÿ‘

Mila was always technically advanced for her age but the growth in confidence in the last month in particular has elevated her game to another level. She has been extremely consistent in football festivals and is such a hard worker every week in training so this award was thoroughly deserved ๐Ÿงก๐Ÿ–คโšฝ๏ธ

Thanks to Milaโ€™s player sponsor ARB WIND

Did you catch our turbine spinning on BBC Scotland? ๐ŸŒฌ๏ธโšก๏ธWe were proud to have supported Raith Rovers FC during their tre...
06/11/2024

Did you catch our turbine spinning on BBC Scotland? ๐ŸŒฌ๏ธโšก๏ธ

We were proud to have supported Raith Rovers FC during their tremendous victory against Ayr in the Scottish Championship clash on Friday. ๐Ÿ™Œ๐Ÿ’™

Itโ€™s fantastic to see our partnership with the club come to life on such a big stage.

Hereโ€™s to more victories and more opportunities to showcase local pride as we continue to support Raith Rovers on and off the pitch. ๐Ÿ™๐ŸŽ‰

Yesterday, our Offshore Project Manager Darren Todd & Managing Director Arran Bell held a crucial safety stand down with...
31/10/2024

Yesterday, our Offshore Project Manager Darren Todd & Managing Director Arran Bell held a crucial safety stand down with some of our team members working onboard the Forth Engineer in Scotland.

In an environment where repetition can breed complacency, we sometimes need to take a step back and dedicate time to identifying hazards, sharing lessons learned and promoting an open dialogue of suggestions and concerns.

A big thank you to our dedicated technicians for their hard work and commitment to maintaining the highest standards of safety while working offshore.

Safety isn't just a checklist; it's a culture.

Pop by stand C25 today where we will be exhibiting alongside our sister company Briggs Marine at Floating Offshore Wind ...
09/10/2024

Pop by stand C25 today where we will be exhibiting alongside our sister company Briggs Marine at Floating Offshore Wind in Aberdeen.

Our Managing Director Arran Bell will be about to discuss our offshore services ๐Ÿ‘‹

We are looking forward to WindEnergy Hamburg next week with colleagues from ARB WIND & Briggs Marine to chat about our o...
17/09/2024

We are looking forward to WindEnergy Hamburg next week with colleagues from ARB WIND & Briggs Marine to chat about our onshore and offshore services to the wind industry.

๐Ÿค Please reach out to schedule a meeting or catch up to discuss:

- Statutory Inspections
- Offshore Construction Support Teams
- Balance of Plant
- Client Representatives
- Above/Below Waterline Inspections

Reactive Offshore Support ๐Ÿ”งOur offshore teams have recently been engaged in mobilising, removing, and reinstalling a sig...
05/08/2024

Reactive Offshore Support ๐Ÿ”ง

Our offshore teams have recently been engaged in mobilising, removing, and reinstalling a significant number of generator alternators in the field.

With the davit cranes out of commission, our engineering team was tasked with devising a solution that could be deployed swiftly and effectively to circumvent the necessity for shoreside maintenance. The scope of works included:

ยท Engineering
ยท Lifting Solution (CTV, Jacket, Genset)
ยท Provision of Bespoke Equipment
ยท Manpower

The offshore support division has reliably provided timely and responsive support for critical tasks to our clients, an area of recognised expertise.

[email protected]

Address

Seaforth House, Seaforth Place
Burntisland
KY39AX

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441592871932

Alerts

Be the first to know and let us send you an email when ARB WIND posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ARB WIND:

Share