Mw building

Call Directions

Mw building all aspects of building work undertaken

Always good to get a pic off the customer when the scaffolds down,🤌🤌getting painted next year to match the house
26/09/2026

Always good to get a pic off the customer when the scaffolds down,🤌🤌getting painted next year to match the house

Second part of this job done,all finished now,onto the next,so,alot of prep work involved in this one from replacing cor...
10/09/2026

Second part of this job done,all finished now,onto the next,so,alot of prep work involved in this one from replacing corroded lintols,and window sills,to meshing the walls with stainless steel mesh ,and window heads were rotten with old battens used and mesh which just dropped apart,all exsisting windows and doors re foamed around,new plastic window heads under lintols and new drip beads over and all siloconed in,(smooth render always pops at some point on them),and finished in a 6mm wet dash mix to match exsisting,cheers Robbie Bolton for a lift with this,onto the next 💪

1 side of the house fixed in arnside,the dashing had seen its day,all blown and cracked,water had been getting in and in...
22/08/2026

1 side of the house fixed in arnside,the dashing had seen its day,all blown and cracked,water had been getting in and into the lintols over the years causing them to crack,reinforced bars in them were all rotten,wasnt in a good way,we had to replace the lintols and put new dpc over,stainless steel mesh was fixed all over the bad places,all window heads had to be sorted and replaced with trims and the old ones were battened off and all rotten,and new stainless drip beads over,,just need to silocone up,waterproof scratch coat and a finished in a 6mm wet dash mix to match exsisting extension,onto the next side once this sides painted,thanks to Robbie Bolton for a hand on this,was alot of prep work,but worth it in the end,

Kitchen going in on a job in beetham,the difference in this house is brilliant compared to what it was,small dark rooms,...
13/08/2026

Kitchen going in on a job in beetham,the difference in this house is brilliant compared to what it was,small dark rooms,we have taken the walls out right through the house to make it open plan,with a back to back kitchen and utility area,thanks to Mattie Wright and lads for fitting kitchen,next step is the floor,lvt right through,wait for them pics 😉😉

Another one wet dashed in 6mm chippings,ready for painting at some point,whole new look for the house up from the old fa...
13/08/2026

Another one wet dashed in 6mm chippings,ready for painting at some point,whole new look for the house up from the old face stone and dry dash,

A job we have done from scratch from taking the old conservatory/building down as it had its day,to digging out and buil...
01/08/2026

A job we have done from scratch from taking the old conservatory/building down as it had its day,to digging out and building a brand new kitchen extension and knock through to make a more useable area,doors and windows fit by jack bolton,,just finished in a 6mm limesone chipping to match exsisting,

Nice extension in hest bank we got the chance of silocone rendering,eco rend fully meshed system with an sf15 chalk whit...
22/07/2026

Nice extension in hest bank we got the chance of silocone rendering,eco rend fully meshed system with an sf15 chalk white finish all materials supplied by global building

Wall taken out on the latest project,all boarded and plastered out ready for kitchen at some point,floor to be patched i...
22/07/2026

Wall taken out on the latest project,all boarded and plastered out ready for kitchen at some point,floor to be patched in but what a difference for the kitchen/dinning area now,

All done,beam filled,the odd extra nogging to go in then can get the roof coating done,then windows and door can go in a...
27/06/2026

All done,beam filled,the odd extra nogging to go in then can get the roof coating done,then windows and door can go in and watertight,ready for internals

Old wooden lintol out,opening getting made wider so new steels in up to old wallplate and new joists for flat roof going...
24/06/2026

Old wooden lintol out,opening getting made wider so new steels in up to old wallplate and new joists for flat roof going on,steels fabricated and supplied by ben merkel

Address

Warton Road
Carnforth
LA59

Telephone

+447966298250

Website

Alerts

Be the first to know and let us send you an email when Mw building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share