05/06/2026
Driffield Padel Club π
2 brand new courts and paths completed.
Full excavation of site and waste removed, preparation for ring beam along with reinforcing then pouring with a c40 readymix......πͺ
External drainage....π§
All ducting installed....β‘οΈ
Shed base installed......πΊ
Final trim, and allowing for 75mm of a permeable tarmac throughout.....π·π»
Landscaped ready for grass seed.....πͺ
For all your groundworks and operated plant hire done right.....π
βοΈ.....07875379520.....βοΈ