GCS Ground works division update!!
The client tasked us with the removal of a failing retaining wall to the rear of a residential block of flats.
So far we have ran in 400 tonnes of crushed material to form the access road, removed 50 meters of retaining wall and its foundations, excavated out to form the new wider and deeper stepped foundations to follow the ground profile and pumped in 130 cubic meters of concrete to form the new mass fill foundations.
Phase two will consist of formwork, RC35 concrete and 10 tonnes of steel instal to create the stepped structural upstand for the new brick retaining wall to be built off.
Updates to follow in the coming months!!!!