πŸ”Š Top reasons Noise Impact Assessments cause delaysA Noise Impact Assessment doesn't usually "fail" because of the asses...
26/08/2026

πŸ”Š Top reasons Noise Impact Assessments cause delays

A Noise Impact Assessment doesn't usually "fail" because of the assessment itself. More often, delays happen because key considerations weren't addressed early enough in the project.

See the graphic below for some of the most common issues...

The earlier potential noise issues are identified, the easier they are to address. Whether it's changes to glazing, ventilation, site layout, or acoustic design, making informed decisions early can help avoid redesigns and keep your project moving.

A Noise Impact Assessment isn't just about meeting planning requirements, it's about understanding potential risks before they become costly problems.

Need advice on whether your site requires a Noise Impact Assessment? Get in touch with our team.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

12/08/2026

πŸ”Š What does an acoustic consultant actually do on a building project?

Acoustic consultancy isn't just for theatres, music venues, or recording studios.

On residential developments, acoustic consultants play an important role in helping buildings achieve the required levels of sound insulation and occupant comfort.

This can include advising on:
βœ”οΈ Wall, floor, and ceiling constructions to meet Part E of the Building Regulations
βœ”οΈ Sound insulation between flats and adjoining homes βœ”οΈ Mechanical plant and service noise
βœ”οΈ Room acoustics for shared spaces
βœ”οΈ External noise affecting the development

By considering acoustics early in the design process, developers can reduce the risk of costly redesigns, failed testing and occupant complaints after handover.

Good acoustic design isn't just about compliance, it's about creating buildings that people enjoy living in.

Have a question about acoustic consultancy or Part E requirements? We'd be happy to help.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

05/08/2026

What is ventilation commissioning and when is it required?

Installing a ventilation system is only part of the process.

Before a new dwelling can achieve Building Regulations sign-off, the system must be commissioned to demonstrate that it's performing as designed.

Under Part F of the Building Regulations, ventilation commissioning verifies that systems such as:
βœ”οΈ MVHR (Mechanical Ventilation with Heat Recovery)
βœ”οΈ MEV (Mechanical Extract Ventilation)
βœ”οΈ Intermittent extract fans have been installed correctly and are delivering the required airflow to each room.

The commissioning results are recorded and form an important part of the compliance process.

By testing and verifying performance before handover, developers can reduce the risk of delays and ensure buildings provide the healthy indoor environment they were designed to achieve.

Have a question about Part F or ventilation commissioning? Our team is here to help.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

29/07/2026

πŸ’§ What is a water usage calculation and what does it prove?

Water usage calculations are used to demonstrate compliance with Part G of the Building Regulations, which sets limits on water consumption in new dwellings.

The calculation assesses the specification of:
βœ”οΈ Taps
βœ”οΈ Showers
βœ”οΈ Baths
βœ”οΈ Toilets
βœ”οΈ Water-using appliances

Using the flow rates and capacities of these products, the calculation determines whether the property will meet the required water consumption target of 125 litres per person per day, or, in some areas, the more stringent 110 litres per person per day standard.

It's a small detail that can have a significant impact on compliance, making product specification an important consideration early in the design process.

Have a question about Part G compliance or water usage calculations? Get in touch.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

Building Regulations compliance isn't just about passing tests.Increasingly, regulations are focused on demonstrating re...
21/07/2026

Building Regulations compliance isn't just about passing tests.

Increasingly, regulations are focused on demonstrating real-world building performance through evidence, calculations, testing and documented decision-making.

The earlier compliance is considered, the smoother project delivery tends to be.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

15/07/2026

🌱 It's not just about solar panels. Here's what a Sustainability Statement actually covers...

A Sustainability Statement explains how a development contributes to sustainable development across three key areas:
🌍 Environmental sustainability
πŸ‘₯ Social sustainability
πŸ“ˆ Economic sustainability

Many local authorities require Sustainability Statements for medium and large-scale developments as part of the planning process.

They can cover a wide range of topics, including:
βœ”οΈ Energy and carbon reduction
βœ”οΈ Biodiversity and green infrastructure
βœ”οΈ Water efficiency
βœ”οΈ Sustainable transport
βœ”οΈ Community benefits
βœ”οΈ Materials and resource use

In simple terms, it's an opportunity to demonstrate how a development will positively contribute to the area beyond the buildings themselves.

As planning policy continues to evolve, Sustainability Statements are becoming an increasingly important part of the planning submission process.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

10/07/2026

🌑️ What is an overheating assessment?

As UK summers become warmer, overheating in homes is becoming a growing consideration for developers, designers and building owners.

Introduced under Part O of the Building Regulations in 2022, overheating assessments are designed to demonstrate that new homes will remain comfortable during hot weather and won't be at risk of excessive heat build-up.

Depending on the project, compliance can be demonstrated through:
βœ”οΈ Simplified Part O assessments
βœ”οΈ TM59 dynamic thermal modelling

Getting overheating assessments right at the design stage can help avoid costly redesigns later and keep projects moving smoothly through the approval process.

Have a question about Part O or overheating assessments? We'd be happy to help.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

We're pleased to share that JosTec has achieved Constructionline Silver Membership πŸŽ‰This accreditation reflects our ongo...
08/07/2026

We're pleased to share that JosTec has achieved Constructionline Silver Membership πŸŽ‰

This accreditation reflects our ongoing commitment to maintaining high standards across the business and gives our clients added confidence that they're working with a trusted and compliant partner.

Constructionline Silver demonstrates that we've met a range of recognised industry requirements, helping to streamline the pre-qualification process for contractors, developers, house builders and public sector organisations.

As we continue to support projects across the UK with services including SAP calculations, overheating assessments, noise impact assessments, air tightness testing, sound insulation testing, and more, we're committed to delivering the same high standards of quality, professionalism and technical expertise on every project.

A big thank you to our team for their continued hard work in achieving this milestone.

We're looking forward to building on this as we continue supporting our clients and partners.

01/07/2026

🏑 What is a SAP calculation and do you actually need one?

It's one of the most common questions we get asked.

If you're building a new home in England or Wales, a SAP calculation is a requirement for Building Regulations compliance.

It assesses the energy performance of the dwelling by considering factors such as:
βœ”οΈ Insulation
βœ”οΈ Windows and doors
βœ”οΈ Heating systems
βœ”οΈ Ventilation
βœ”οΈ Renewable technologies

The results are used to demonstrate compliance and support building control sign-off.

Have a question about SAP calculations or building compliance? Get in touch.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

πŸ’¨ Top Tip: Schedule air tightness testing before glazing is fully completed to help avoid costly rework later.Identifyin...
30/06/2026

πŸ’¨ Top Tip: Schedule air tightness testing before glazing is fully completed to help avoid costly rework later.

Identifying potential leakage issues earlier in the programme gives you more opportunity to resolve them quickly and efficiently, before final finishes and sign-off deadlines become a pressure point.

A little forward planning can save significant time, cost, and disruption later in the project.

πŸ“ž 01923 518 923
πŸ“§ [email protected]

Address

Suite 107, Moda Business Centre, Stirling Way
London
WD62BW

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+441923518923

Alerts

Be the first to know and let us send you an email when JosTec posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share