Harehill Social Club, Addlestone
HC Fire has designed, installed, commissioned and tested a new L1 system, running an Advanced panel with Hochiki protocol.
Due to the building characteristics, standard FP was a suitable cable choice and the wiring complies with BS 5839-1 and BS 7671. The install was a mix of surface conduit with metal saddles and galvanised girder clips with metal ties, so every cable is fixed safely and the system integrity is protected in an emergency.
The installation took 4 days to complete and is ready for a soak test. We also had to release one access control door when the fire alarm is activated.
We’ll be doing the maintenance and servicing there for the foreseeable.