Durham Lifting

Call Directions Website

Durham Lifting Founded in 1996, Durham Lifting specialises in bespoke lifting solutions from concept to completion.

We offer fabrication, crane systems, installation, maintenance, sales, hire, statutory examination, and load testing up to 3000 tonne.

30 years of dedication, experience and being part of Durham Lifting’s journey. This year marks an incredible milestone f...
21/10/2026

30 years of dedication, experience and being part of Durham Lifting’s journey.

This year marks an incredible milestone for Emma Stonehouse, who has spent three decades growing alongside the business, from joining us as an apprentice to becoming our Internal Sales Manager.

Over those 30 years, Emma has played a part in some of our biggest projects, witnessed the evolution of the industry and built an incredible understanding of what makes Durham Lifting what it is today.

Emma, thank you for everything you’ve contributed to the business over the last three decades. We’re incredibly fortunate to have you as part of our team.
Here’s to the next chapter!

24 hours’ notice. A vessel arriving into port. A 30 tonne crane ready for testing.Durham Lifting was recently called in ...
19/10/2026

24 hours’ notice. A vessel arriving into port. A 30 tonne crane ready for testing.

Durham Lifting was recently called in to carry out a thorough examination and load test on a deck crane, verifying its structural integrity and ensuring it was safe for continued use.

With just 24 hours’ notice of the vessel arriving into port, our engineers mobilised fully equipped to complete the work on board.

Using a water bag and load cell to provide a calibrated load, the crane was successfully tested to 30 tonnes, with certification completed following the test.

A great example of our team responding quickly when the timescale is tight, without compromising on the testing and verification required.

Almost 200 years of engineering, restored for the future.We’re incredibly proud to have played a part in the restoration...
16/10/2026

Almost 200 years of engineering, restored for the future.

We’re incredibly proud to have played a part in the restoration of Whorlton Bridge, one of County Durham’s most significant historic structures.

Durham Lifting has supported the project since 2024, carrying out structural testing on original bridge components to assess their integrity and help inform which elements could be retained as part of the restoration.

Originally opened in 1831, the Grade II* listed bridge spans the River Tees and has now reopened following an extensive programme of specialist engineering, conservation and construction work.

Our Managing Director, Amanda Gardiner, was invited to attend the official reopening, joining the project team and local community to see the bridge back in use.

Projects like this are a brilliant reminder that engineering isn’t always about creating something new. Sometimes it’s about using modern expertise to help protect what has already stood for generations.

A fantastic project to have contributed to, right here in the North East.

Read more about Durham Lifting’s involvement:
www.durhamlifting.co.uk/whorlton-bridge-restoration-durham-lifting

14/10/2026

The finishing touches before dispatch.

These MultiSec stools have been manufactured, sprayed in our unmistakable MultiSec pink and put through final testing ahead of leaving us.

The team are now completing the final preparation, including applying the MultiSec branding, before they’re ready to make their way to the client.

A look behind the scenes at those final stages before another engineered lifting solution leaves the yard.

Another MultiSec order getting ready for dispatch. 🏗️Our latest order of heavy duty jacking and support stools has been ...
13/10/2026

Another MultiSec order getting ready for dispatch. 🏗️
Our latest order of heavy duty jacking and support stools has been completed, tested and prepared for the client within a four-week turnaround.

Engineered for heavy-load support and jacking applications, each stool can support up to 250 tonnes when used with the correct loading arrangement and setup, with a 50-tonne jacking capacity per stool.

Each unit also provides a 900×900 mm support area and a 200×200 mm point-load area, giving the customer a robust engineered solution for demanding support and jacking requirements.

From production through to testing and final preparation, the MultiSec team has supported the order throughout the four week turnaround.

Another specialist engineered lifting solution ready to head out of the door.

Not every lifting operation calls for a standard solution.MultiSec Jacking & Support Stools are engineered for heavy loa...
12/10/2026

Not every lifting operation calls for a standard solution.

MultiSec Jacking & Support Stools are engineered for heavy load support, packing and jacking applications, with each stool capable of handling loads of up to 250 tonnes when used with the correct loading arrangement and setup.

With a 900 × 900 mm support area, they provide a robust engineered solution for demanding applications where controlled load support is required.

We currently have 12 available across two sizes, eight at 800 mm and four at 1000 mm, at a special sale price of £2,000 per unit.

For specifications or to discuss the right setup for your application, speak to the MultiSec team.

09/10/2026

A proud moment for Durham Lifting as our 30 year story is featured by Insight Energy.

The article looks back at our journey from a family business founded by Amanda Graciano and Frank Pickersgill, to supporting complex lifting and engineering projects across offshore wind, marine, defence, infrastructure and beyond.

Three decades have brought significant growth and change, but our focus on engineering expertise, quality and supporting our customers remains at the heart of the business.

Thank you to for sharing our story, and to our team, customers and partners who continue to be part of it.

As offshore wind projects have grown in scale and ambition, Durham Lifting has evolved alongside them.

08/10/2026

One system. Multiple lifting solutions.

Another MultiSec order prepared for Germany, with Multi-110 and Multi-170 modular spreader beams heading to our distributor, HLR. 🇩🇪

The advantage of a modular system is flexibility. Different spans and lifting capacities can be achieved through configurable components, giving customers a lifting system that can adapt to different project requirements.

Designed and manufactured in the UK, with engineering, manufacture and proof load testing supported in house, MultiSec provides more than a product. It provides an engineered lifting solution from one team.

05/10/2026

Our 30th anniversary story is now live on the Durham Lifting website, looking back at three decades of growth, engineering, family and the people who have helped shape the business since 1996.

From our beginnings to supporting major projects across the UK and internationally today, there’s a lot to reflect on, and plenty still to come.

Read the full story on our website.
www.durhamlifting.co.uk/30-years-of-durham-lifting

Celebrating 30 years of Durham Lifting, from our beginnings in 1996 to specialist lifting equipment, proof load testing and engineered lifting solutions.

You find a lot when you start looking back through 30 years of Durham Lifting. 📸Paul has been up in the archives at Brit...
02/10/2026

You find a lot when you start looking back through 30 years of Durham Lifting. 📸

Paul has been up in the archives at Britannia Test House, going through old photographs, documents and memories from across the years.

Projects, equipment, familiar faces and plenty of reminders of just how much both Durham Lifting and the lifting industry have changed along the way.

As we mark our 30th anniversary, we’ll be opening up the archives and sharing more of the people, projects and moments that have shaped the business.

There are a few stories up there that haven’t been told for a long time. 👀

Address

Britannia Testhouse, Romaldkirk Road
Middlesbrough
TS21HB

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441642247709

Alerts

Be the first to know and let us send you an email when Durham Lifting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share