26/08/2026
Straight Into Action In Kalgoorlie! 🚨
Our new Kalgoorlie team has wasted no time getting to work, recently responding to a breakdown involving a 32m long, 1200mm wide CV07 feeder belt. The 1200mm 4PN150 6/2 belt required a single splice, with four of our team members mobilised to site.
Meanwhile, our Geraldton branch was already committed to a scheduled shutdown and needed some extra manpower. The Kalgoorlie team stepped in on the second day, working seamlessly with the existing crew to ensure the work was completed.
It was a challenging job, with the belt having snapped on the underside of the conveyor while the chute was still full of product. The team also had to contend with difficult weather conditions and an unexpected extra night on site after the gravel road was closed.
Despite the challenges, the team got the job done — and the site was extremely happy with our fast response time and ability to have a crew on site quickly.
A great start for our Kalgoorlie branch and a great example of the local support we’re now able to provide across the Goldfields. 👏