PROJECT COMPLETE – 10 DAY TURNAROUND✨
Swipe for the before photos!!
Another property completed and handed back ready for occupation.
The bathroom required a full strip out due to significant water damage around the WC area. Once removed, further damage to the floor structure was uncovered, along with a substantial amount of debris beneath the floorboards.
Works completed:
• Full bathroom strip out
• Rebuild of damaged subfloor
• New wet room flooring (cap and cove)
• Installation of new sanitaryware
• New storage cupboard
• Modern shower panels fitted throughout
The living area and bedroom also required remedial works following a leak from the radiator, which had caused sections of the floor to become unstable.
Works completed:
• Replacement of damaged floorboards
• New underlay and carpet
• Full preparation and redecoration throughout
The property has now been fully reinstated and is ready for its next occupant.