29/10/2026
Heavy Rain. High Water Pressure. 16.5m Deep Excavation.
When excavation goes deeper, the biggest concern is soil stability and surrounding structural safety—especially during Ahmedabad’s heavy monsoon.
At a 16.5m deep excavation project in Thaltej, Ahmedabad, Dishmaan’s Soil Nailing solution helped maintain a stable excavation surface even under challenging rain conditions.
But Soil Nailing is not simply about installing nails and shotcrete.
The right solution depends on soil conditions, excavation depth, surcharge from surrounding structures and the correct nail depth, diameter and spacing.
Dishmaan brings Geotechnical Consulting + Designing + Ex*****on under one roof, with an experienced team that designs the solution according to your project's specific site conditions.
Build deeper with greater confidence.
Talk to Dishmaan for your next excavation project.