29/08/2026
Sri Vinayaga Building Demolishers
5 Floors Built, But One Side RCC Beam Must Go!
On an active 5-storey construction site, design changes required removing a single reinforced concrete beam after the entire frame was raised.
Using sledgehammers or pneumatic breakers was not an optionโthe impact shockwaves would travel straight down the columns, causing structural micro-cracks across multiple floors.
Our team deployed Precision Diamond Concrete Cutting to execute a controlled removal:
Zero Vibration: Surrounding columns and floor slabs remained 100% protected.
Surgical Edge: Clean, razor-straight cut with no secondary patching required.
Structural Integrity Intact: Core stability preserved with zero load transfer issues.
Whether it is 5 floors or 10, safety and precision are non-negotiable.
๐ Location: Coimbatore, Tamil Nadu
๐ Get an On-Site Assessment:
+91 98420 44789 | +91 98438 59593 | +91 98422 90908
DiamondConcreteCutting VibrationFreeDemolition CivilContractorsCoimbatore PrecisionCutting