GEFT SOLAR

GEFT SOLAR We are empanelled as authorized channel partner by Govt. Of India, Ministry of New & Renewable Energ

GEFT SOLARAs Per MNRE Portal 18Jul2026 Notice NONDCR use 31Dec2026 Lasthttps://mnre.gov.in/en/notice-category/current-no...
18/07/2026

GEFT SOLAR
As Per MNRE Portal 18Jul2026 Notice NONDCR use 31Dec2026 Last
https://mnre.gov.in/en/notice-category/current-notices/
ALMM List-II (for solar PV cells) – No blanket extension subject to limited window till 31.12.2026 for commissioning Net-Metering and Open Access RE power projects
ALMM लिस्ट-II (सोलर PV सेल्स के लिए) – नेट-मीटरिंग और ओपन एक्सेस RE पावर प्रोजेक्ट्स को चालू करने के लिए 31.12.2026 तक की सीमित समय-सीमा के साथ, कोई सामान्य समय-विस्तार (blanket extension) नहीं दिया जाएगा।

Sub: Approved List of Models and Manufacturers (ALMM) — No blanket extension of ALMM List-ll (for solar PV cells) subject to providing a limited window to only Net- Metering / Open Access, RE power projects to commission with exemption from ALMM List-l, till 31% December 2026 — reg.
विषय: मॉडल और निर्माताओं की स्वीकृत सूची (ALMM) — ALMM सूची-II (सोलर PV सेल के लिए) में कोई सामान्य विस्तार नहीं; हालांकि, नेट-मीटरिंग / ओपन एक्सेस और RE (नवीकरणीय ऊर्जा) पावर प्रोजेक्ट्स को 31 दिसंबर 2026 तक ALMM सूची-I से छूट के साथ चालू करने के लिए एक सीमित समय-सीमा दी जाएगी।

1. As per para 8 of MNRE's O.M. no. 283/59/2024-GRID SOLAR dated 09.12.2024, reiterated vide MNRE’s O.M. no. 283/59/2024-GRID SOLAR dated 28.07.2025, all the Net-Metering projects and Open Access RE power projects, which get commissioned on or after 1% June 2026, shall mandatorily source their solar PV modules from ALMM List-I and solar PV cells from ALMM List-II.
1. MNRE के O.M. नंबर 283/59/2024-GRID SOLAR (दिनांक 09.12.2024) के पैरा 8 के अनुसार, जिसे MNRE के O.M. नंबर 283/59/2024-GRID SOLAR (दिनांक 28.07.2025) में दोहराया गया है, सभी नेट-मीटरिंग प्रोजेक्ट्स और ओपन एक्सेस RE पावर प्रोजेक्ट्स, जो 1 जून 2026 को या उसके बाद चालू होंगे, उनके लिए अपने सोलर PV मॉड्यूल ALMM लिस्ट-I से और सोलर PV सेल ALMM लिस्ट-II से लेना अनिवार्य होगा।

2. Subsequently, MNRE, vide its O.M. No. 283/63/2025-GRID SOLAR dated 25" May 2026, had conveyed regarding no blanket extension of ALMM List-ll beyond 1%t June 2026, subject to protection of investments already made.
2. इसके बाद, MNRE ने अपने O.M. नंबर 283/63/2025-GRID SOLAR (दिनांक 25 मई 2026) के माध्यम से यह सूचित किया था कि पहले से किए गए निवेश की सुरक्षा को ध्यान में रखते हुए, 1 जून 2026 के बाद ALMM लिस्ट-II का कोई सामान्य विस्तार नहीं किया जाएगा।
3. In supersession of MNRE's O.M. No. 283/63/2025-GRID SOLAR dated 25" May 2026, and associated O.M.s namely - O.M. No. 283/63/2025-GRID SOLAR dated 8" June 2026, O.M. No. 318/84/2024-Grid Connected Rooftop-Part(3) dated 8" June 2026, O.M. No. 283/40/2026-GRID SOLAR dated 15" June 2026, O.M. No. 283/40/2026-GRID SOLAR dated 23” June 2026, it has been decided that while there will be no blanket extension in applicability of ALMM List-Il for solar power projects, however, a limited window is being provided for Net-metering projects and Open Access RE power projects, whereby such projects can now commission with exemption of ALMM List-ll (for solar PV cells), till 31%t December 2026. Earlier this dispensation for Net-metering projects and Open Access renewable power projects was available till 31% May 2026. Net- metering projects and Open Access renewable power projects commissioned after 31% December, 2026, will be required to comply with the ALMM List-Il provisions. Any reference to the O.M.s referred above in this para, as might appear in any other O.M.s of MNRE regarding ALMM, shall be construed to have been correspondingly amended in line with the decision above.
3. MNRE के O.M. नंबर 283/63/2025-GRID SOLAR (दिनांक 25 मई 2026) और उससे जुड़े O.M.s — जैसे O.M. नंबर 283/63/2025-GRID SOLAR (दिनांक 8 जून 2026), O.M. नंबर 318/84/2024-Grid Connected Rooftop-Part(3) (दिनांक 8 जून 2026), O.M. — को रद्द करते हुए... 15 जून 2026 के O.M. No. 283/40/2026-GRID SOLAR और 23 जून 2026 के O.M. No. 283/40/2026-GRID SOLAR के तहत यह तय किया गया है कि सोलर पावर प्रोजेक्ट्स के लिए ALMM लिस्ट-II के लागू होने की समय-सीमा में कोई सामान्य विस्तार (blanket extension) नहीं किया जाएगा। हालांकि, नेट-मीटरिंग प्रोजेक्ट्स और ओपन एक्सेस RE पावर प्रोजेक्ट्स के लिए एक सीमित समय दिया जा रहा है, जिसके तहत ऐसे प्रोजेक्ट्स अब 31 दिसंबर 2026 तक ALMM लिस्ट-II (सोलर PV सेल्स के लिए) से छूट के साथ चालू (commission) हो सकते हैं। पहले, नेट-मीटरिंग प्रोजेक्ट्स और ओपन एक्सेस रिन्यूएबल पावर प्रोजेक्ट्स के लिए यह छूट 31 मई 2026 तक उपलब्ध थी। 31 दिसंबर 2026 के बाद चालू होने वाले नेट-मीटरिंग प्रोजेक्ट्स और ओपन एक्सेस रिन्यूएबल पावर प्रोजेक्ट्स को ALMM लिस्ट-II के नियमों का पालन करना होगा। इस पैराग्राफ में बताए गए O.M.s का ज़िक्र अगर MNRE के ALMM से जुड़े किसी अन्य O.M. में आता है, तो उसे ऊपर लिए गए फ़ैसले के अनुसार ही संशोधित माना जाएगा।

4. Aforesaid decision has been taken after detailed deliberations with various stakeholders of the solar industry, to ensure a smooth transition to ALMM List-Il (for solar PV cells), for the Net-metering projects and Open Access renewable power projects.
4. यह फ़ैसला सोलर इंडस्ट्री के विभिन्न स्टेकहोल्डर्स के साथ विस्तृत चर्चा के बाद लिया गया है, ताकि नेट-मीटरिंग प्रोजेक्ट्स और ओपन एक्सेस रिन्यूएबल पावर प्रोजेक्ट्स के लिए ALMM List-II (सोलर PV सेल्स के लिए) में आसानी से बदलाव (smooth transition) सुनिश्चित किया जा सके।

5. This issues with the approval of Hon'ble Minister (New & Renewable Energy).
5.यह माननीय मंत्री (नवीन और नवीकरणीय ऊर्जा) की मंज़ूरी से जारी किया गया है।

GEFT SOLARScan Now........
25/12/2025

GEFT SOLAR
Scan Now........

Address

Morar
Gwalior
474006

Alerts

Be the first to know and let us send you an email when GEFT SOLAR posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GEFT SOLAR:

Shortcuts

Share