π· DEFINITION: π·
ββββββββββββββββββ
Lifting with crane is the process of using a crane and certified lifting accessories (slings, shackles, hooks, etc.) to safely lift, move, and position heavy loads from one place to another under controlled conditions as per approved lifting plan and permit to work.
ββββββββββββββββββ
π· DOCUMENTS & PERMIT REQUIREMENTS: π·
ββββββββββββββββββ
β’ APPROVED LIFTING PLAN
β’ VALID PERMIT TO WORK (PTW)
β’ RISK ASSESSMENT / JSA (JOB SAFETY ANALYSIS)
β’ THIRD PARTY CRANE CERTIFICATE
β’ THIRD PARTY LIFTING ACCESSORIES CERTIFICATES (SLINGS, SHACKLES, HOOKS)
β’ COMPETENT CRANE OPERATOR CERTIFICATE
β’ COMPETENT RIGGER & SIGNALMAN CERTIFICATES
β’ DAILY PRE-USE INSPECTION CHECKLIST
β’ ROAD MOVEMENT / ROAD CERTIFICATE (IF APPLICABLE)
β’ UNDERGROUND UTILITY CLEARANCE CERTIFICATE
β’ BARRICADING AND EXCLUSION ZONE PLAN
β’ EMERGENCY RESPONSE PLAN
β’ SAFE DISTANCE CONFIRMATION FROM ELECTRICAL LINES & OTHER UTILITIES
β’ APPROVAL FROM AUTHORIZED PERSON / SITE IN CHARGE
ββββββββββββββββββ
π· PURPOSE OF CRANE: π·
ββββββββββββββββββ
β’ LIFT HEAVY LOADS SAFELY
β’ MOVE MATERIALS TO HEIGHT OR DISTANCE
β’ REDUCE MANUAL HANDLING
β’ IMPROVE WORK EFFICIENCY
ββββββββββββββββββ
π· TYPES OF CRANES: π·
ββββββββββββββββββ
β’ MOBILE CRANE
β’ TOWER CRANE
β’ CRAWLER CRANE
β’ OVERHEAD CRANE
ββββββββββββββββββ
π· CRANE COMPONENTS: π·
ββββββββββββββββββ
β’ BOOM (MAIN ARM)
β’ JIB
β’ HOOK
β’ WIRE ROPE
β’ WINCH / HOIST DRUM
β’ COUNTERWEIGHT
β’ OUTRIGGERS
β’ SLEWING UNIT
β’ OPERATOR CABIN
β’ SHEAVES / PULLEYS
ββββββββββββββββββ
π· PRE-INSPECTION / THIRD PARTY REQUIREMENT: π·
ββββββββββββββββββ
β’ PRE-USE DAILY INSPECTION OF CRANE BEFORE OPERATION
β’ CRANE MUST HAVE VALID THIRD PARTY CERTIFICATION
β’ ALL LIFTING ACCESSORIES MUST BE THIRD PARTY CERTIFIED
β’ DEFECTIVE EQUIPMENT MUST NOT BE USED
β’ LOAD TEST CERTIFICATE MUST BE AVAILABLE AND VALID
ββββββββββββββββββ
π· OPERATOR REQUIREMENTS: π·
ββββββββββββββββββ
β’ TRAINED AND COMPETENT OPERATOR
β’ VALID LICENSE / CERTIFICATION
β’ FAMILIAR WITH LOAD CHART AND LIMITS
β’ FOLLOW SIGNALMAN INSTRUCTIONS
β’ MUST UNDERSTAND SITE LIFT PLAN
ββββββββββββββββββ
π· COMMON HAZARDS: π·
ββββββββββββββββββ
β’ FALLING LOAD
β’ CRANE OVERTURNING
β’ CONTACT WITH POWER LINES
β’ IMPROPER RIGGING
β’ STRUCK BY LOAD
ββββββββββββββββββ
π· CONTROL MEASURES: π·
ββββββββββββββββββ
β’ FOLLOW APPROVED LIFTING PLAN
β’ USE TRAINED PERSONNEL ONLY
β’ INSPECT ALL RIGGING BEFORE USE
β’ MAINTAIN EXCLUSION ZONE
β’ USE PROPER COMMUNICATION SYSTEM
ββββββββββββββββββ
π· CRANE SAFETY DEVICES: π·
ββββββββββββββββββ
β’ LOAD MOMENT INDICATOR (LMI)
β’ ANTI TWO-BLOCK DEVICE
β’ LIMIT SWITCHES
β’ OVERLOAD PROTECTION SYSTEM
β’ EMERGENCY STOP SYSTEM
β’ WIND SPEED INDICATOR (ANEMOMETER)
ββββββββββββββββββ
π· WIND SPEED LIMITS: π·
ββββββββββββββββββ
β’ NORMAL SAFE LIMIT: 32 km/h (20 mph)
β’ ACTUAL LIMIT DEPENDS ON CRANE TYPE AND MANUFACTURER
β’ STOP WORK IF WIND IS GUSTY OR UNSTABLE
β’ STRICTER LIMITS FOR CRITICAL LIFTS AND HIGH HEIGHT OPERATIONS
ββββββββββββββββββ
π· KEY TERMS: π·
ββββββββββββββββββ
β’ SWL (SAFE WORKING LOAD) β MAXIMUM SAFE LOAD FOR CRANE
β’ WLL (WORKING LOAD LIMIT) β RATING OF LIFTING ACCESSORIES
ββββββββββββββββββ
π· CRITICAL LIFTING: π·
ββββββββββββββββββ
β’ HIGH-RISK LIFTING OPERATION REQUIRING SPECIAL CONTROL AND APPROVAL
β’ USED FOR HEAVY, COMPLEX, OR HIGH-RISK LIFTS
β’ MAY INCLUDE WORK OVER LIVE PLANT OR HAZARDOUS AREAS
β’ MAY REQUIRE TANDEM LIFTING (TWO CRANES)
β’ INCLUDES:
β’ TAILING LIFTING β CONTROLLED SUPPORT DURING LOAD POSITIONING
β’ BLIND LIFTING β OPERATOR CANNOT SEE LOAD DIRECTLY
β’ REQUIRES DETAILED LIFT PLAN AND RISK ASSESSMENT
β’ STRICT COMMUNICATION BETWEEN OPERATOR AND SIGNALMAN
β’ HIGHER AUTHORITY APPROVAL REQUIRED
β’ STRICT WEATHER AND WIND CONTROL
ββββββββββββββββββ
π· KEY SAFETY RULES: π·
ββββββββββββββββββ
β’ NEVER STAND UNDER SUSPENDED LOAD
β’ NEVER EXCEED SWL OR WLL
β’ MAINTAIN SAFE DISTANCE FROM LOAD
β’ FOLLOW HAND SIGNALS / RADIO COMMUNICATION
β’ STOP WORK IF UNSAFE CONDITIONS OCCUR
ββββββββββββββββββ
π· CRANE INTERVIEW QUESTIONS: π·
ββββββββββββββββββ
β’ WHAT IS LIFTING WITH CRANE?
β’ WHAT IS SWL AND WLL?
β’ WHAT IS CRITICAL LIFTING?
β’ WHAT IS TAILING AND BLIND LIFTING?
β’ WHAT DOCUMENTS ARE REQUIRED BEFORE LIFTING?
β’ WHAT IS PRE-INSPECTION OF CRANE?
β’ WHAT ARE CRANE SAFETY DEVICES?
β’ WHAT ACTION IN HIGH WIND CONDITION?