ABVS Colonizers & Developers

ABVS Colonizers & Developers Plotting Scheme Near DMIC Corridor, Phulera
By A.B.V.S Group

18/05/2015
24/01/2014
19/11/2013

I CHEATED on my fears, BROKE UP with my doubts, GOT ENGAGED to my Faith, and now I'm MARRYING my dreams. so now I am DIVORCING my pass. Thank GOD...

28/09/2013
Guys one more GOOD NEWSWorld's largest solar power plant to come up in RajasthanIndia will build the world's largest 4,0...
22/09/2013

Guys one more GOOD NEWS
World's largest solar power plant to come up in Rajasthan
India will build the world's largest 4,000 MW solar project in the western state of Rajasthan.
The ultra-mega green solar power project would be built in two phases in an area close to Sambhar Lake, about 75 km from Jaipur
The government has finalised setting up of the project in Rajasthan, in the SSL area close to Sambhar Lake, with a total capacity of 4,000 Mega Watt (MW). Therefore, this will be the largest solar based power project in the world, it said.

Delhi-Mumbai Industrial Corridor is a mega infra-structure project of USD 90 billion with the financial & technical aids...
21/09/2013

Delhi-Mumbai Industrial Corridor is a mega infra-structure project of USD 90 billion with the financial & technical aids from Japan, covering an overall length of 1483 KMs between the political capital and the business capital of India, i.e. Delhi and Mumbai.

A MOU was signed in December 2006 between Vice Minister, Ministry of Economy, Trade and Industry (METI) of Government of Japan and Secretary, Department of Industrial Policy & Promotion (DIPP). A Final Project Concept was presented to both the Prime Ministers during Premier Abe’s visit to India in August 2007.

Finally Government of India has announced establishing of the Multi-modal High Axle Load Dedicated Freight Corridor (DFC) between Delhi and Mumbai, covering an overall length of 1483 km and passing through the six States - U.P, NCR of Delhi, Haryana, Rajasthan, Gujarat and Maharashtra, with end terminals at Dadri in the National Capital Region of Delhi and Jawaharlal Nehru Port near Mumbai. Distribution of length of the corridor indicates that Rajasthan (39%) and Gujarat (38%) together constitute 77% of the total length of the alignment of freight corridor, followed by Haryana and Maharashtra 10% each and Uttar Pradesh and National Capital Region of Delhi 1.5 % of total length each. This Dedicated Freight Corridor envisages a high-speed connectivity for High Axle Load Wagons (25 Tonne) of Double Stacked Container Trains supported by high power locomotives. The Delhi - Mumbai leg of the Golden Quadrilateral National Highway also runs almost parallel to the Freight Corridor. This corridor will be equipped with an array of infrastructure facilities such as power facilities, rail connectivity to ports en route etc. Approximately 180 million people, 14 percent of the population, will be affected by the corridor’s development.


This project incorporates Nine Mega Industrial zones of about 200-250 sq. km., high speed freight line, three ports, and six air ports; a six-lane intersection-free expressway connecting the country’s political and financial capitals and a 4000 MW power plant. Several industrial estates and clusters, industrial hubs, with top-of-the-line infrastructure would be developed along this corridor to attract more foreign investment. Funds for the projects would come from the Indian government, Japanese loans, and investment by Japanese firms and through Japan depository receipts issued by the Indian companies.


This high-speed connectivity between Delhi and Mumbai offers immense opportunities for development of an Industrial corridor along the alignment of the connecting infrastructure. A band of 150 km (Influence region) has been chosen on both sides of the Freight corridor to be developed as the Delhi-Mumbai Industrial Corridor. The vision for DMIC is to create strong economic base in this band with globally competitive environment and state-of-the-art infrastructure to activate local commerce, enhance foreign investments, real-estate investments and attain sustainable development. In addition to the influence region, DMIC would also include development of requisite feeder rail/road connectivity to hinterland/markets and select ports along the western coast.


It is also envisaged that the alignment of the proposed corridor will have nine junction stations for exchange of traffic between the existing railway system and the DFC. The junctions are:


• Vasai Road: To cater to traffic to/from Mumbai, other than J.Nehru Port

• Gothangam: For traffic to/from Hazira Complex, Jalgaon-Udhna

• Makarpura (Vadodara): For traffic to/from Ahmedabad, Vadodara and Vadodara -Godhra Routes

• Amli Road (Sabarmati): For traffic to/from ICD-Sabarmati, ViramgamSabarmati Route, Ahmedabad, Rajkot and Bhavnagar Divisions of Western Railway

• Palanpur: For traffic to/from Kandla/ Mundra Ports and Gandhidham Area

• Marwar Junction: For Traffic from/to Jodhpur area (and lCD-Jodhpur)

• Phulera: For traffic to/from Jaipur- Tundla and Jaipur-Sawai Madhopur Routes'

• Rewari: For traffic to/from Rewari-Hissar-Ludhiana/Bathinda Routes'

• Pirthala (Tughlakabad): For traffic to/from Tughlakabad (and ICDTughalakabad)


Delhi-Mumbai Industrial Corridor is to be conceived as a Model Industrial Corridor of international standards with emphasis on expanding the manufacturing and services base and develop DMIC as the 'Global Manufacturing and Trading Hub'. The Government is considering this ambitious project to establish, promote and facilitate Delhi-Mumbai industrial corridor to augment and create social and physical infrastructure on the route which is world class and will help spurring economic growth of the region.


Integrated Corridor Development Approach for DMIC


High impact/ market driven nodes - integrated Investment Regions (IRs) and Industrial Areas (IAs) have been identified within the corridor to provide transparent and investment friendly facility regimes. These regions are proposed to be self-sustained industrial townships with world-class infrastructure, road and rail connectivity for freight movement to and from ports and logistics hubs, served by domestic/ international air connectivity, reliable power, quality social infrastructure, and provide a globally competitive environment conducive for setting up businesses. An Investment Region (IRs) would be a specifically delineated industrial region with a minimum area of over 200 square kilometers (20,000 hectares), while an Industrial Area (IAs) would be developed with a minimum area of over 100 square kilometers (10,000 hectares). 24 such nodes - 9 IRs and 15 IAs spanning across six states have been identified after wide consultations with the stakeholders i.e the State Governments and the concerned Central Ministries. It is proposed that 6 IR and 6 IAs would be taken up for implementation in the First Phase during 2008-2012 and rest of the development would be phased out in the next 4 years. The nodes identified for Phase-1 are:


Short listed Investment Regions (IRs):


• Dadri – Noida - Ghaziabad Investment Region in Uttar Pradesh as General Manufacturing Investment Region;

• Manesar – Bawal Investment Region in Haryana as Auto Component/ Automobile Investment Region;

• Khushkhera – Bhiwadi – Neemrana Investment Region in Rajasthan as General Manufacturing/ Automobile/ Auto Component Investment Region;

• Pitampura – Dhar – Mhow Investment Region in Madhya Pradesh

• Bharuch – Dahej Investment Region in Gujarat as Petroleum, Chemical and Petro Chemical Investment Region (PCPIR);

• Igatpuri – Nashik-Sinnar Investment Region in Maharashtra as General Manufacturing Investment Region;


Short listed Industrial Areas (IAs):

• Meerut – Muzaffarnagar Industrial Area in Uttar Pradesh, Engineering/ Manufacturing;

• Faridabad – Palwal Industrial Area in Haryana, Engineering & Manufacturing;

• Jaipur – Dausa Industrial Area in Rajasthan, Marble/Leather/Textile;

• Neemuch – Nayagaon Industrial Area in Madhya Prdaesh

• Industrial Area with Greenfield Port at Alewadi/ Dighi in Maharashtra, Greenfield Port Based


Organizational Structure & Project Implementation Framework:


It is envisaged that a four-tier system, as institutional framework, would be set up for the implementation of DMIC. It constitutes:


• An Apex body, headed by the Finance Minister with concerned Central Ministers and Chief Ministers of respective DMIC States as Members for overall guidance, planning, and approvals;


• A Corporate entity, Delhi Mumbai Industrial Corridor Development Corporation (DMICDC), specially envisaged to coordinate Project Development, Finance and Implementation, headed by a full time CMD and having representation from the central government, state governments and FIs;


• A State-level Coordination Entity/ Nodal Agency responsible for coordination between the DMICDC and various state government entities and the project implementing agencies/ special purpose vehicles.


• Project specific special purpose vehicles (SPVs) who would actually implement the projects. These SPVs can be owned by state Governments in terms of governance structure, Board of Directors etc. Some of these SPVs can also be formed by central/state governments and their agencies.


The corridor project likely to be implemented in two phases namely – Phase-I & Phase-II. An estimated $90 to $100 billion would be required to create the infrastructure in the first phase of the project. Japanese companies are expected to invest over $10 billion in the proposed corridor during the first phase.

This scheme is situated in Govt. approved residential area near DMIC Corridor.http://www.dmic.co.in/
21/09/2013

This scheme is situated in Govt. approved residential area near DMIC Corridor.
http://www.dmic.co.in/

Address

Phulera

Alerts

Be the first to know and let us send you an email when ABVS Colonizers & Developers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share