Reliable power infrastructure depends on more than installation. It requires precise testing, thorough verification, and systematic commissioning.
At the 220/33 kV Mudhale AIS Substation, Baramati, Ashida’s expertise contributed to testing and commissioning activities, supporting protection system readiness and reliable operation.
From panel testing and protection checks to system verification and pre-energisation preparation, each step plays a critical role in ensuring the substation is ready for operation.
Building confidence in power systems through precision, expertise, and dependable ex*****on.