20/01/2020
After the successful completion and handover of Amara Ridge, we continue with the construction of Applewood, our Kshs 2.5 bn residential development in Miotoni Road - Karen.
Excavation works for Phase 1 foundation is done as well as steel fixing for two of the three units. Landscape at the front yard is currently ongoing together with stripping of top soil on the main road.
For more information, call 0701534174 or sign up here: https://www.cytonn.com/cytonnaires/cb