Reynier Scholten Freelance Project Management

Reynier Scholten Freelance Project Management The rendering of project management services across the African continent on an assignment basis at competitive rates

This should become a global requirement.
11/08/2018

This should become a global requirement.

Did you know the City has installed two drainage nets in Henley Reserve? Started as a trial to reduce the discharge of rubbish from drainage systems, these nets have collected 370kg of debris from entering our nature reserve since their installation. How amazing is that! Read more about this project > https://kwin.city/2vgMlev

Recently done a needs analysis for the Lesotho Highlands Water Project Phase 2, the Polihali dam, tunnels, roads, bridge...
08/08/2017

Recently done a needs analysis for the Lesotho Highlands Water Project Phase 2, the Polihali dam, tunnels, roads, bridges (the longest being 120m high and 600m long crossing the Senqu River near Mokhotlong), housing and infrastructure.
The photo is of the area where the new Concrete Faced Rock-fill Dam of some 165 meters high will be with a crest hight of some 2,075 AMSL.

15/10/2015

In a follow up on last week's post regarding teamwork, I just received the good news...

We won! Our presentation did the trick.

Once again, a thank you to all involved; the owner, the developer, the architects, the procurement specialist and the ladies that made us gallons of coffee.
A big thank you to all of you.

09/10/2015

The importance of a loyal and dedicated team.

I was recently approached by a property developer to join forces with two young architects in Lesotho to develop and present a project proposal plan with a view of acquiring a site and develop the same for commercial purposes. We were literally given a week to do the concept plans taking due cognizance of traffic flows, an active stream, human and environmental issues, security, catering for SME's and the disabled amongst other things.
With the time constraints, a lot of midnight oil was burnt and the entire proposal was completed an hour before the scheduled presentation time. The team spirit and dedication developed during this short period of time was such that everyone on the project team would sacrifice their own "private time" with a view of putting the package together and be an understudy for the other team members in the event of an unfortunate mishap.
The presentation was done, the numerous questions posed were answered comprehensively and the adjudication panel seemed satisfied and impressed. We shall know the end result by the end of next week but it is the considered view of all involved that we did ace it.
On this note I wish to thank both Thabo and Morris for their commitment, dedication and effort; you guys did well and I am both appreciative and proud of your effort, dedication, flexibility and loyalty. I'm proud to have young professionals of your calibre on my team and it is both my wish and belief that we shall do numerous projects together in the short and medium term.
I thank you.

Some close ups of the Thermo Plastic Road Markings on the M3 Road, Blantyre to Zomba, Malawi.
12/08/2015

Some close ups of the Thermo Plastic Road Markings on the M3 Road, Blantyre to Zomba, Malawi.

Applying Thermo Plastic Road markings on the M3 Road, Blantyre to Zomba, Malawi.By applying FIDIC 1999 1st Ed., declarin...
12/08/2015

Applying Thermo Plastic Road markings on the M3 Road, Blantyre to Zomba, Malawi.
By applying FIDIC 1999 1st Ed., declaring a dispute and calling in the DB, it saved the company €647,820.00 by receiving payment for using TPRM as opposed to normal Retroreflective road paint.

Mini bridge using natural rock as form work to reinforced concrete for aesthetic purposes.
16/07/2015

Mini bridge using natural rock as form work to reinforced concrete for aesthetic purposes.

Placing the first seal.
16/07/2015

Placing the first seal.

January 2007 to August 2008.
14/07/2015

January 2007 to August 2008.

14/07/2015

Reynier Scholten Project Management.

I have 19 years of experience with Civil Engineering Contractors and 19 years with Consulting Engineers, all gained across the SADC region, I have the following services to offer:

Project programming, tracking and analysis with MS Projects.

Projected cash flows based on your approved/proposed construction program and priced BoQ.

Resource scheduling/analysis/ requirements based on your envisaged production outputs and resource availability.

Plant mechanical availability and utilization analysis and graphical presentation thereof.

Time and motion studies.

The preparation, analysis and submission of contractual claims and Variation Orders.

Interim and final Payment Certificates.

The preparation and submission of Monthly Progress Reports and Completion Report.

Representing your company at compulsory Site Inspections with particular attention to risks, obstacles, accessibility and access to local labour.

The drafting of method statements for both tender and construction purposes.

Operational area: The entire Sub Sahara Africa region.

Contact numbers: +27 63 353 0665 (South Africa) and +266 63 68 3212 (Lesotho).

e-mail: [email protected]
[email protected]

See my LinkedIn profile: Reynier Scholten.

Rates are competitive and negotiable.

Address

Maseru
100

Alerts

Be the first to know and let us send you an email when Reynier Scholten Freelance Project Management posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Reynier Scholten Freelance Project Management:

Share