iPS NORD

iPS NORD International wind turbine service company in offshore and onshore energy sectors.

DEME Offshore has signed a contract with Poland’s Energomontaż-Północ Gdynia (EPG) for the fabrication and delivery of e...
07/06/2021

DEME Offshore has signed a contract with Poland’s Energomontaż-Północ Gdynia (EPG) for the fabrication and delivery of equipped secondary steel structures for the Arcadis ost 1 offshore wind farm in the German Baltic Sea.

https://ipsnord.no/en/naudinga/deme-places-order-for-arcadis-ost-1-hardware-in-poland/

DEME Offshore has signed a contract with Poland’s Energomontaż-Północ Gdynia (EPG) for the fabrication and delivery of equipped secondary steel structures for the Arcadis ost 1 offshore wind farm in the German Baltic Sea. EPG will deliver 27 sets of equipped secondary steel structures for turbi...

The transmission system operators (TSOs) in Latvia and Estonia, AS Augstsprieguma tikls (AST) and Elering AS, have signe...
03/05/2021

The transmission system operators (TSOs) in Latvia and Estonia, AS Augstsprieguma tikls (AST) and Elering AS, have signed a cooperation agreement to study possible solutions for connecting the two countries’ joint 1 GW offshore wind project in the Baltic Sea to their mainland grids.

https://ipsnord.no/en/naudinga/latvia-estonia-exploring-grid-connection-options-for-joint-1-gw-owf-project/

The transmission system operators (TSOs) in Latvia and Estonia, AS Augstsprieguma tikls (AST) and Elering AS, have signed a cooperation agreement to study possible solutions for connecting the two countries’ joint 1 GW offshore wind project in the Baltic Sea to their mainland grids. Latvia and Est...

Ørsted and Enefit have signed a Memorandum of Understanding (MoU) to together develop large-scale offshore wind opportun...
27/04/2021

Ørsted and Enefit have signed a Memorandum of Understanding (MoU) to together develop large-scale offshore wind opportunities in the Baltics countries.

https://ipsnord.no/en/naudinga/orsted-and-enefit-to-jointly-develop-baltic-sea-offshore-wind-projects/

Ørsted and Enefit have signed a Memorandum of Understanding (MoU) to together develop large-scale offshore wind opportunities in the Baltics countries. Under the MoU, the companies plan to establish a joint venture for the development of offshore wind in the Baltics, including the Liivi project in ...

The Copenhagen-based Vento Maritime has secured a contract to provide weather services for Vattenfall’s offshore wind fa...
20/04/2021

The Copenhagen-based Vento Maritime has secured a contract to provide weather services for Vattenfall’s offshore wind farms.

https://ipsnord.no/en/naudinga/vattenfall-chooses-vento-maritime-for-weather-watch/

The Copenhagen-based Vento Maritime has secured a contract to provide weather services for Vattenfall’s offshore wind farms. Under the contract, the Danish company will provide the services for nine of Vattenfall’s offshore wind farms located in the North Sea, Irish Sea and Baltic Sea. According...

German offshore transmission system operator (TSO) in charge of the Baltic Sea infrastructure, 50Hertz, has opened a ten...
16/04/2021

German offshore transmission system operator (TSO) in charge of the Baltic Sea infrastructure, 50Hertz, has opened a tender for unexploded ordnance (UXO) operations on the cable route of the Ostwind 3 project.

https://ipsnord.no/en/naudinga/50hertz-looking-for-uxo-team-for-ostwind-3/

German offshore transmission system operator (TSO) in charge of the Baltic Sea infrastructure, 50Hertz, has opened a tender for unexploded ordnance (UXO) operations on the cable route of the Ostwind 3 project. The work scope encompasses the provision and operation of all assets necessary for the UXO...

36 of the 72 Siemens Gamesa 8.4 MW wind turbines have been installed on the Kriegers Flak wind farm in the Danish Baltic...
11/04/2021

36 of the 72 Siemens Gamesa 8.4 MW wind turbines have been installed on the Kriegers Flak wind farm in the Danish Baltic Sea, Jan De Nul reports.

https://ipsnord.no/en/naudinga/kriegers-flak-wind-turbines-halfway-there/

36 of the 72 Siemens Gamesa 8.4 MW wind turbines have been installed on the Kriegers Flak wind farm in the Danish Baltic Sea, Jan De Nul reports. Jan De Nul, Siemens Gamesa and Vattenfall installed the very first wind turbine for the Kriegers Flak offshore wind farm at the end of January. The last ....

Energinet has issued a tender seeking floating lidar measurements for the areas where the Danish energy islands and acco...
02/04/2021

Energinet has issued a tender seeking floating lidar measurements for the areas where the Danish energy islands and accompanying offshore wind farms are set to be built.

https://ipsnord.no/en/naudinga/floating-lidars-wanted-for-danish-energy-islands/

Energinet has issued a tender seeking floating lidar measurements for the areas where the Danish energy islands and accompanying offshore wind farms are set to be built. The tender is divided into four lots, with the first two concerning atmospheric and oceanographic measurements for project areas i...

Following the purchase of a 7,300 MW offshore wind energy pipeline three months ago, the company continues to consolidat...
30/03/2021

Following the purchase of a 7,300 MW offshore wind energy pipeline three months ago, the company continues to consolidate Poland as a new growth market.

https://ipsnord.no/en/naudinga/iberdrola-acquires-three-onshore-wind-farms-in-poland-reinforcing-commitment-to-this-wind-energy-market/

Following the purchase of a 7,300 MW offshore wind energy pipeline three months ago, the company continues to consolidate Poland as a new growth market. With a joint capacity of 163 MW, virtually all of their production is associated with 10-year power purchase agreements (PPAs) The projects will be...

To meet its decarbonisation targets, Europe will need to install as much offshore wind capacity each year from 2030 to 2...
25/03/2021

To meet its decarbonisation targets, Europe will need to install as much offshore wind capacity each year from 2030 to 2050 as it has built in the last 20 years.

https://ipsnord.no/en/naudinga/europe-must-unlock-perfect-match-of-offshore-wind-and-hydrogen/

To meet its decarbonisation targets, Europe will need to install as much offshore wind capacity each year from 2030 to 2050 as it has built in the last 20 years. That’s the forecast from Ulrik Stridbæk, vice-president of regulatory affairs at Danish energy giant Ørsted, who highlighted the sti...

Are you looking for well-trained personnel to help you with your next project? 💪Not only can we help you with qualified ...
22/03/2021

Are you looking for well-trained personnel to help you with your next project? 💪
Not only can we help you with qualified people as well as help with payrolls, taxes, travel arrangements, and more!

Click on the link below to register and get a special offer.
- https://ipsnord.no/en/for-business/

Poland’s Office of Competition and Consumer Protection (UOKiK) has approved the setting up of two joint ventures between...
15/03/2021

Poland’s Office of Competition and Consumer Protection (UOKiK) has approved the setting up of two joint ventures between domestic firms and foreign companies to develop offshore wind farms off the country’s coast.

https://ipsnord.no/en/naudinga/poland-greenlights-two-offshore-wind-joint-ventures/

Poland’s Office of Competition and Consumer Protection (UOKiK) has approved the setting up of two joint ventures between domestic firms and foreign companies to develop offshore wind farms off the country’s coast. A 50:50 jv between Polska Grupa Energetyczna (PGE) and Orsted will develop, own a...

Danish transmission system operator Energinet is seeking environmental engineering consultancy services for the energy i...
12/03/2021

Danish transmission system operator Energinet is seeking environmental engineering consultancy services for the energy islands and the accompanying offshore wind farms in the North Sea and the Baltic Sea.

https://ipsnord.no/en/naudinga/denmark-gets-to-work-on-energy-islands/

Danish transmission system operator Energinet is seeking environmental engineering consultancy services for the energy islands and the accompanying offshore wind farms in the North Sea and the Baltic Sea. The scope of work covers a strategic environmental assessment (SEA) and environmental investiga...

Address

Liepų Gatvė 54-2
Klaipeda

Opening Hours

Monday 09:00 - 18:00
Tuesday 09:00 - 18:00
Wednesday 09:00 - 18:00
Thursday 09:00 - 18:00
Friday 09:00 - 17:00

Alerts

Be the first to know and let us send you an email when iPS NORD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share