30/05/2023
Deteriorated sections have been carefully dismantled while shoring the existing structure to make it safe and stable.
Reuse of original building materials and components throughout structural interventions where possible, original features will be restored and incorporated into new layouts.
Trench excavations for underground utilities are underway, creating a network of services linking the individual structures transforming the old building into modern working spaces.
GP BORG GROUP
DV Architects
JP Health and Safety Consultants
Camilleri and Cuschieri Consulting Engineers