18/02/2012
*General Requirements*
Customers are expected to be present when installation is carried out.
Customers are required to sign the Work Order Acceptance Form before any installation work commences.
Some minimal drilling will be required to connect the fibre cable from the outside to the inside of a customer's premise.
The equipment being installed will require access to 4 power points.
Appointments for installation will not be made for premises that are being renovated.
*Standard Installation*
A fee of RM200 will be imposed for standard installation.
The wiring work carried out will run along the surface of walls and will be enclosed in a casing called 'raceway'.
If additional cabling is required beyond what is provided in the standard package, extra charges will be imposed.
The extra charges will be included in the customer's next bill and will not require upfront cash payment.
*Non-Standard Installation*
Non-standard installation includes concealed wiring, wiring over the plaster ceiling, and underground / buried cabling.
If customers require non – standard wiring, customers can engage their own contractors to carry out the wiring work or select a contractor from TM's panel of contractors.
Charges will be imposed for non-standard installation activities.
Charges quoted will cover the cost of workmanship only. These charges are to be settled in cash with the contractor concerned.
All material costs will be included in customer's next bill.
*For High-Rise Buildings*
If customer's premise is located in a high – rise building, the customer is required to obtain the building management's permission prior to installation.
If the building already has internal copper cabling, the customer must terminate the existing fixed line broadband service (if any) to install UniFi since it will utilize the same wiring.